Differences between revisions 1 and 2
Revision 1 as of 2018-11-05 15:34:16
Size: 222
Editor: YukiInoue
Comment:
Revision 2 as of 2018-11-16 12:24:15
Size: 418
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
 * Sawada: Run1
 * Kozakai: Board
 * Inoue: for Run02
 * Ko-Han: PhD plan
 * Ogaki: Plan of DGS test
 * Tomigami: Result of Camera test
 * Yuki: JPS meeting (10min)
 * Yuki: CAL group under DAC (5min)
 * Sawada: Analysis result of PCAL injection test (Run1;15min)
 * Yuki: PCAL injection test for (Run02;10min)
 * Kozakai: Final design of KAGRA OFS board (5min)
 * Ko-Han: PhD plan (15min)
 * Ogaki: Plan of DGS test(10min)
 * Tomigami: Result of Camera test(10min)

2018/11/19 18:00

Agenda

  • Yuki: Schedule (10min)
  • Yuki: JPS meeting (10min)
  • Yuki: CAL group under DAC (5min)
  • Sawada: Analysis result of PCAL injection test (Run1;15min)
  • Yuki: PCAL injection test for (Run02;10min)
  • Kozakai: Final design of KAGRA OFS board (5min)
  • Ko-Han: PhD plan (15min)
  • Ogaki: Plan of DGS test(10min)
  • Tomigami: Result of Camera test(10min)

MEMO

KAGRA/Subgroups/CAL/CAL_Meeting/20181119 (last edited 2018-12-13 15:15:08 by takahiro.sawada)