Differences between revisions 3 and 8 (spanning 5 versions)
Revision 3 as of 2018-12-07 10:17:52
Size: 444
Editor: YukiInoue
Comment:
Revision 8 as of 2018-12-10 22:05:15
Size: 444
Editor: husan-yu.chu
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
 * Kozakai: Progress of Y-end Periscope instllation (10min)
 * Kozakai: Result of Harmonics noise measurement (5min)
Line 10: Line 8:
 * Bill: result of Laser board test in AS(5min)
 * Bill: result of Laser board test in AS(5min) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9510|slide]]
 * Wataru: Debug of DGS(10min)

2018/12/10 18:00

Agenda

  • Yuki: Schedule (10min)
  • Yuki: Publications(10min)
  • Sawada: Analysis result of PCAL injection test (Run1 and Run2;20min)
  • Sawada: PCAL injection test for Run03(10min)
  • Kohan: Progress of Toyama uni. setup(5min)
  • Bill: result of Laser board test in AS(5min) slide

  • Wataru: Debug of DGS(10min)

MEMO

KAGRA/Subgroups/CAL/CAL_Meeting/20181203 (last edited 2018-12-13 15:27:30 by takahiro.sawada)