= 2018/12/10 18:00 = == Agenda == * Yuki: Schedule (10 min) * Y.Takahiro: Software (10min) * Takaaki: Commissioning (10min) [[attachment:CAL_yokozawa_181217_ver2.pdf|pdf]] * Chihiro: Debug plan of Xend (Run03; 10min) * U.Takafumi and Yuk: Characterization of Actuator(10min)[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9521|JGW]] == MEMO == ==== Software ==== * Darkhan and Takahiro Y. prepared the dedicated network switch for the DMT. * k1bcst0 is connected to DAQ(10Gbps optical fiber), DGS(1Gbps copper) and DMT(1Gbps copper). * I set that online frames flow on the DMT network, but they have flowed on the DGS network yet. (Problem on DGS side) * cal-gst is connected to DMT(1Gbps copper), DMG(1Gbps copper) and DMG(10Gbps optical fiber). * 10Gbps NIC for DMG is not available on cal-gst. (Problem on CAL side) * After 10Gbps NIC can be activated, one of the 1Gbps copper cable will be connected to DGS network. (cal-gst has only two NIC for 1Gbps.)