⇤ ← Revision 1 as of 2019-08-28 16:47:58
Size: 560
Comment:
|
← Revision 2 as of 2019-08-28 18:57:03 ⇥
Size: 943
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 13: | Line 13: |
* Request: assignment of DARM error and control signal (DQ) | * Request: assignment of DARM error and control signal (DQ) -> Restart |
Line 15: | Line 16: |
* Homework: Cross check with FSM -> Ogaki | * Start the DARM for Low Latency, When should we switch the C10. * Test the demodulation, Line removal function * Homework: Cross check with FSM -> Ogaki -> consistent |
Line 22: | Line 25: |
* | * Poster presentation: * Error estimation of FSM *Optical gain: Slides |
Line 25: | Line 30: |
* No update | * ITM Y coil driver was changed. But, both ETM is not yet. * Measurement procedure document |
Line 32: | Line 38: |
* Encoder system: get the rotation freq. with encoder * Satellite box |
2019/08/28
18:30 JST (Japan) 17:30 CST (Taiwan) 10:30 CET (Geneva)
- Task manager: Schedule
- Ogaki: FSM report
- Yuki: Calibration error
Memo Sep3-5 LVC meeting
- Online
Request: assignment of DARM error and control signal (DQ) -> Restart
- Low Latency
- Start the DARM for Low Latency, When should we switch the C10.
- Test the demodulation, Line removal function
Homework: Cross check with FSM -> Ogaki -> consistent
- Offline
- Server is preparing
- We can use it from next week
- FSM
- Poster presentation:
- Error estimation of FSM
- Optical gain: Slides
- DARM
- ITM Y coil driver was changed. But, both ETM is not yet.
- Measurement procedure document
- Pcal
- 8/26-8/30: Optical efficiency test (Pang)
- -8/30: Tcam (Wu-Cheng)
- Gcal
- Encoder system: get the rotation freq. with encoder
- Satellite box