Differences between revisions 1 and 2
Revision 1 as of 2019-08-28 16:47:58
Size: 560
Editor: YukiInoue
Comment:
Revision 2 as of 2019-08-28 18:57:03
Size: 943
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:
  * Request: assignment of DARM error and control signal (DQ)   * Request: assignment of DARM error and control signal (DQ) -> Restart
 
Line 15: Line 16:
  * Homework: Cross check with FSM -> Ogaki   * Start the DARM for Low Latency, When should we switch the C10.
  * Test the demodulation, Line removal function
  * Homework: Cross check with FSM -> Ogaki -> consistent
Line 22: Line 25:
  *   * Poster presentation:
  * Error estimation of FSM
   *Optical gain: Slides
Line 25: Line 30:
  * No update   * ITM Y coil driver was changed. But, both ETM is not yet.
  * Measurement procedure document
Line 32: Line 38:
   * Encoder system: get the rotation freq. with encoder
   * Satellite box

2019/08/28

18:30 JST (Japan) 17:30 CST (Taiwan) 10:30 CET (Geneva)

  • Task manager: Schedule
  • Ogaki: FSM report
  • Yuki: Calibration error


Memo Sep3-5 LVC meeting

  • Online
    • Request: assignment of DARM error and control signal (DQ) -> Restart

  • Low Latency
    • Start the DARM for Low Latency, When should we switch the C10.
    • Test the demodulation, Line removal function
    • Homework: Cross check with FSM -> Ogaki -> consistent

  • Offline
    • Server is preparing
    • We can use it from next week
  • FSM
    • Poster presentation:
    • Error estimation of FSM
      • Optical gain: Slides
  • DARM
    • ITM Y coil driver was changed. But, both ETM is not yet.
    • Measurement procedure document
  • Pcal
    • 8/26-8/30: Optical efficiency test (Pang)
    • -8/30: Tcam (Wu-Cheng)
  • Gcal
    • Encoder system: get the rotation freq. with encoder
    • Satellite box

KAGRA/Subgroups/CAL/CAL_Meeting/20190828 (last edited 2019-08-28 18:57:03 by YukiInoue)