= 2019/08/28 = 18:30 JST (Japan) 17:30 CST (Taiwan) 10:30 CET (Geneva) * Task manager: Schedule * Ogaki: FSM report * Yuki: Calibration error ---------------------------- Memo Sep3-5 LVC meeting * Online * Request: assignment of DARM error and control signal (DQ) -> Restart * Low Latency * Start the DARM for Low Latency, When should we switch the C10. * Test the demodulation, Line removal function * Homework: Cross check with FSM -> Ogaki -> consistent * Offline * Server is preparing * We can use it from next week * FSM * Poster presentation: * Error estimation of FSM *Optical gain: Slides * DARM * ITM Y coil driver was changed. But, both ETM is not yet. * Measurement procedure document * Pcal * 8/26-8/30: Optical efficiency test (Pang) * -8/30: Tcam (Wu-Cheng) * Gcal * Encoder system: get the rotation freq. with encoder * Satellite box