Line 10: Line 10:
 JPS
 * Sawada
 * Ogaki
Line 11: Line 15:
    * keep the latest filter information
Line 13: Line 18:
  *
  * When should we do HWT -> HW problem
  * Demod. test -> Can we use BS? -> We can use MICH for test of pipeline.
  * We use the silent run. We can request to Commissioning team for Mich operation 1 or 2 night.
  * Final goal: 30-1500Hz, 10%, 10deg, < 1sec
  
Line 19: Line 27:
  *   * Start to wight reconstruction code.
  * Sawada-san give scripts.
Line 30: Line 39:
  *   * Satellite box: almost done
  * Gcal board and Chassis

2019/09/11

18:30 JST (Japan) 17:30 CST (Taiwan) 10:30 CET (Geneva)

  • Yuki and Task manager: Schedule
  • Yuki: Line study
  • Pang: Result of Pcal stability


Memo

  • JPS
  • Sawada
  • Ogaki
  • Online
    • keep the latest filter information
  • Low Latency
    • When should we do HWT -> HW problem

    • Demod. test -> Can we use BS? -> We can use MICH for test of pipeline.

    • We use the silent run. We can request to Commissioning team for Mich operation 1 or 2 night.
    • Final goal: 30-1500Hz, 10%, 10deg, < 1sec

  • Offline
    • calgst-hl
  • FSM
    • Start to wight reconstruction code.
    • Sawada-san give scripts.
  • DARM
  • Pcal
    • Line injection is ongoing: 15.8Hz
    • After that, we will inject the software and actuator lines at 15.9Hz, 15.7Hz
    • We will fix the Y-end system on middle Sep.17
  • Gcal
    • Satellite box: almost done
    • Gcal board and Chassis