Line 10: | Line 10: |
JPS * Sawada * Ogaki |
|
Line 11: | Line 15: |
* keep the latest filter information |
|
Line 13: | Line 18: |
* |
* When should we do HWT -> HW problem * Demod. test -> Can we use BS? -> We can use MICH for test of pipeline. * We use the silent run. We can request to Commissioning team for Mich operation 1 or 2 night. * Final goal: 30-1500Hz, 10%, 10deg, < 1sec |
Line 19: | Line 27: |
* | * Start to wight reconstruction code. * Sawada-san give scripts. |
Line 30: | Line 39: |
* | * Satellite box: almost done * Gcal board and Chassis |
2019/09/11
18:30 JST (Japan) 17:30 CST (Taiwan) 10:30 CET (Geneva)
- Yuki and Task manager: Schedule
- Yuki: Line study
- Pang: Result of Pcal stability
Memo
- JPS
- Sawada
- Ogaki
- Online
- keep the latest filter information
- Low Latency
When should we do HWT -> HW problem
Demod. test -> Can we use BS? -> We can use MICH for test of pipeline.
- We use the silent run. We can request to Commissioning team for Mich operation 1 or 2 night.
Final goal: 30-1500Hz, 10%, 10deg, < 1sec
- Offline
- calgst-hl
- FSM
- Start to wight reconstruction code.
- Sawada-san give scripts.
- DARM
- Pcal
- Line injection is ongoing: 15.8Hz
- After that, we will inject the software and actuator lines at 15.9Hz, 15.7Hz
- We will fix the Y-end system on middle Sep.17
- Gcal
- Satellite box: almost done
- Gcal board and Chassis