2019/09/11
18:30 JST (Japan) 17:30 CST (Taiwan) 10:30 CET (Geneva)
- Yuki and Task manager: Schedule
- Yuki: Line study
- Pang: Result of Pcal stability
Memo
- Online
- Low Latency
- Offline
- calgst-hl
- FSM
- DARM
- Pcal
- Line injection is ongoing: 15.8Hz
- After that, we will inject the software and actuator lines at 15.9Hz, 15.7Hz
- We will fix the Y-end system on middle Sep.17
- Gcal