= 2019/10/9 = 18:30 JST (Japan) 17:30 CST (Taiwan) 10:30 CET (Geneva) * Yuki and Task manager: Schedule [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8221|slide]] * Ogaki: Measurement plan for Master thesis * Pang : Rotation test ---------------------------- Memo * Online * Low Latency * Offline * FSM * * DARM * Injection * * Pcal * First detection of Pcal line! * Improved the Camera script (http://klog.icrr.u-tokyo.ac.jp/osl/?r=10864) * WSK was arrived.(Ito-kun will report in next week.) * We will try the WSK calibration(WST<->WSK, WST<->XY-end Pcal) on Oct.22 week. * Gcal * Discussed the design of vibration isolation structure