= 2019/10/23 = 18:30 JST (Japan) 17:30 CST (Taiwan) 10:30 CET (Geneva) * Yuki and Task managers: Schedule [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8221|slide]] * Yuki: Discussion of CAL shift ---------------------------- == Memo == * Online * Low Latency * Offline * FSM * * DARM * Injection * * Pcal * Gcal -------- == ToDo list == * Instruments: * Camera analysis (a and b vector) -> Yuki * Optical efficiency -> * WSK measurement -> Ito, Yuki * Overplot x_pcal -> Yuki * Verification test(Common rejection etc.) -> Yuki * DARM model * Filter analysis (Amp, Phase, Coh, and Residual) -> Darkhan, Cory and Pang * Ver.1 Subway map -> Yuki, Y.Takahiro, S.Takahiro, Darkhan * Online (Site) * Management of filters -> Y.Takahiro * Management of Measured results ->Wataru, Y.Takahiro * FSM -> Wataru * Error estimation * DARM sigma test in High latency -> Yuki, S.Takahiro * DARM sigma test in Low latency -> Yuki, S.Takahiro * Low latency * Line demodulation -> S.Takahiro, Darkhan, Y.Takahiro * time dependency correction -> S.Takahiro, Darkhan, * H_pcal(SLM tools) -> S.Takahiro, Darkhan * DARM Sigma (Error estimation) -> Yuki * High latency * High latency pipeline -> Yuki, Wu-Chang * Long time monitor ->Wu-Chang * Event frame -> Wu-Chang * DARM sigma -> Yuki, T.Sawada * H_pcal(SLM tools) -> * Database -> Wu-Chang, T.Yamamoto, T.Sawada, Y.Inoue * Injection * Swept sine and sine gauss -> T.Sawada * time delay measurement -> T.Sawada * CBC injection ? -> T.Sawada * GCal * Total time measurement (T=?): Pang, Yuki * Vibration peak(Hz, …): Pang, Yuki * Vacuum and Temp. test(mbar, C): Pang,Yuki * Stability of poles(Δx): Pang, Yuki * Mass distribution test(Δm): Pang, Yuki * Synchronization test (Δθ,Δω): Pang, Yuki * Duty * Line test (Every day; when we lock the IFO with FPMI condition) * WSK measurement(Every week) * 10/25 * 10/29 * 11/5 * 11/12 * 11/19 * 11/26 * 12/3 * 12/10 * 12/17