= 2019/11/13 = 18:30 JST (Japan) 17:30 CST (Taiwan) 10:30 CET (Geneva) * Yuki and Task managers: Schedule [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8221|slide]] * Discussion of Pcal long time stability (Koki and Yuki) * Discussion of TF measurement for Y-end driver (Darkhan and Yuki) * Measurement result of density distribution of Gcal (Pang) ---------------------------- == Memo == * Online: - IR X-arm lock comes back yesterday. - OLTF measurement (Low frequency) - unknown time delay (due to the high freq pole???) - DARM open loop(Current): measureing bw 10 - 30 Hz - Coil inductance -> Measurement?(Ask Takayuki) * Low Latency - Developing low latency with time dependency - Test will start from weekend (maybe). - How to estimate the smoothing effect? - We employ oplev infomations. Now, we are installing the sensors. * Offline * Error estimation * G1910916-v1 Calibration error study I -AAAI- * G1910986-v1 Calibration error study II -Arm length- * G1910919-v2 Calibration error study III -Sensing- * G1910985-v1 Calibration error study IV -Photon Calibrator- * G1910957-v1 Calibration error study V -TypeA- * G1910982-v1 Calibration error study VI -Coil driver- * G1910984-v1 Calibration error study VII -Actuator- * FSM * New idea of optical gain measurement * DARM * Man power assignment (Darkhan + Someone) * Injection * how to confirm the time delay * Pcal * Keithley 2100 * Gcal -------- == ToDo list == * Instruments: * Camera analysis (a and b vector) -> Yuki * --(Optical efficiency -> Yuki, Ito)-- * --(WSK measurement -> Ito, Yuki)-- * Overplot x_pcal -> Yuki * Verification test(Common rejection etc.) -> Yuki * DARM model * --(Filter analysis (Amp, Phase, Coh, and Residual) -> Yuki)-- * Ver.1 Subway map -> Yuki, Y.Takahiro, S.Takahiro, Darkhan * Online (Site) * Management of filters -> Y.Takahiro * Management of Measured results ->Wataru, Y.Takahiro * FSM -> Wataru * Error estimation * DARM sigma test in High latency -> Yuki, S.Takahiro * Low latency * Line demodulation -> S.Takahiro, Darkhan, Y.Takahiro * time dependency correction -> S.Takahiro, Darkhan, * High latency * High latency pipeline -> Yuki, Wu-Chang * Long time monitor ->Wu-Chang * Event frame -> Wu-Chang * DARM sigma -> Yuki, T.Sawada * H_pcal(SLM tools) -> Darkhan * Injection * Swept sine and sine gauss -> T.Sawada * time delay measurement -> T.Sawada * CBC injection ? -> T.Sawada * GCal * Total time measurement (T=?): Pang, Yuki * Vibration peak(Hz, …): Pang, Yuki * Vacuum and Temp. test(mbar, C): Pang,Yuki * Stability of poles(Δx): Pang, Yuki * Mass distribution test(Δm): Pang, Yuki * Synchronization test (Δθ,Δω): Pang, Yuki * Duty * Line test (Every day; when we lock the IFO with FPMI condition) * WSK measurement(Every week) * 11/11-(X) Y.Takahiro、Ito * 11/18-(X,Y) Yuki、S.Takahiro * 11/25-(X) Darkhan、Yokozawa * 12/2-(X) Ito、Y.Takahiro * 12/9-(X,Y) S.Takahiro、Yuki * 12/16-(X) Tatsuki, Ito