Size: 637
Comment:
|
← Revision 3 as of 2020-01-29 16:18:25 ⇥
Size: 882
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 13: | Line 13: |
* 2/17 (Sawada, Darkhan) * 3/31 (Yuki,Ogaki) * 4/31 (Yamamoto,Ito) |
* 2/17 (Sawada, Darkhan) * 3/31 (Yuki,Ogaki) * 4/31 (Yamamoto,Ito) * Contents of Calibration day * FSM measurement * PCAL, Actuator, CLTF measurement * WSK measurement * Y-end PCal injection(for sign and delay) * sine gauss injection (for time delay) * Long time injection(for time delay) |
2020/1/29
18:00 JST (Japan) 17:00 CST (Taiwan) 10:00 CET (Geneva)
Report of JRPC meetingslide
- public talk in LVKC meeting and LVK CAL F2F meeting
- Progress on Low latency
Time delay analysis (Pcal read back signal)slide
- Documentation
Duty Line test (Every day; when we lock the IFO with FPMI condition)
- WSK measurement(Every month)
- 2/17 (Sawada, Darkhan)
- 3/31 (Yuki,Ogaki)
- 4/31 (Yamamoto,Ito)
- Contents of Calibration day
- FSM measurement
- PCAL, Actuator, CLTF measurement
- WSK measurement
- Y-end PCal injection(for sign and delay)
- sine gauss injection (for time delay)
- Long time injection(for time delay)