Differences between revisions 2 and 3
Revision 2 as of 2020-01-29 16:10:03
Size: 637
Editor: YukiInoue
Comment:
Revision 3 as of 2020-01-29 16:18:25
Size: 882
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:
 * 2/17 (Sawada, Darkhan)
 * 3/31 (Yuki,Ogaki)
 * 4/31 (Yamamoto,Ito)
  * 2/17 (Sawada, Darkhan)
  * 3/31 (Yuki,Ogaki)
  * 4/31 (Yamamoto,Ito)
 * Contents of Calibration day
  * FSM measurement
  * PCAL, Actuator, CLTF measurement
  * WSK measurement
  * Y-end PCal injection(for sign and delay)
  * sine gauss injection (for time delay)
  * Long time injection(for time delay)

2020/1/29

18:00 JST (Japan) 17:00 CST (Taiwan) 10:00 CET (Geneva)

  • Report of JRPC meetingslide

  • public talk in LVKC meeting and LVK CAL F2F meeting
  • Progress on Low latency
  • Time delay analysis (Pcal read back signal)slide

  • Documentation


Duty Line test (Every day; when we lock the IFO with FPMI condition)

  • WSK measurement(Every month)
    • 2/17 (Sawada, Darkhan)
    • 3/31 (Yuki,Ogaki)
    • 4/31 (Yamamoto,Ito)
  • Contents of Calibration day
    • FSM measurement
    • PCAL, Actuator, CLTF measurement
    • WSK measurement
    • Y-end PCal injection(for sign and delay)
    • sine gauss injection (for time delay)
    • Long time injection(for time delay)

KAGRA/Subgroups/CAL/CAL_Meeting/20200129 (last edited 2020-01-29 16:18:25 by YukiInoue)