2020/1/29
18:00 JST (Japan) 17:00 CST (Taiwan) 10:00 CET (Geneva)
Report of JRPC meetingslide
- public talk in LVKC meeting and LVK CAL F2F meeting
- Progress on Low latency
Time delay analysis (Pcal read back signal)slide
- Documentation
Duty Line test (Every day; when we lock the IFO with FPMI condition)
- WSK measurement(Every month)
- 2/17 (Sawada, Darkhan)
- 3/31 (Yuki,Ogaki)
- 4/31 (Yamamoto,Ito)
- Contents of Calibration day
- FSM measurement
- PCAL, Actuator, CLTF measurement
- WSK measurement
- Y-end PCal injection(for sign and delay)
- sine gauss injection (for time delay)
- Long time injection(for time delay)