= 2020/1/29 = 18:00 JST (Japan) 17:00 CST (Taiwan) 10:00 CET (Geneva) * Report of JRPC meeting[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11430|slide]] * public talk in LVKC meeting and LVK CAL F2F meeting * Progress on Low latency * Time delay analysis (Pcal read back signal)[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0114/G2011430/002/Pcal_time_delay_map.pdf|slide]] * Documentation ---------------------------- Duty Line test (Every day; when we lock the IFO with FPMI condition) * WSK measurement(Every month) * 2/17 (Sawada, Darkhan) * 3/31 (Yuki,Ogaki) * 4/31 (Yamamoto,Ito) * Contents of Calibration day * FSM measurement * PCAL, Actuator, CLTF measurement * WSK measurement * Y-end PCal injection(for sign and delay) * sine gauss injection (for time delay) * Long time injection(for time delay)