Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2020-02-12 18:08:13
Size: 144
Editor: YukiInoue
Comment:
Revision 3 as of 2020-02-12 19:42:05
Size: 479
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
  * WSK measurement (3.5h)
  * FSM (3.5h)
  * A and C measurements (1h)
  * Swept sine (log上でほぼ均等に;UGF付近の重点的な測定 5h)
  * A and C measurements (1h)
  * Actuator TF measurement (Y単独, 30min)
  * Y-end PCAL injection for time delay (Swept sine, 30min)
  * CAL line (22Hz以下; 30min, 事前に)

2020/2/12

18:00 JST (Japan) 17:00 CST (Taiwan) 10:00 CET (Geneva)

  • Report of Task managers
  • Review document
  • Contents of CAL day
    • WSK measurement (3.5h)
    • FSM (3.5h)
    • A and C measurements (1h)
    • Swept sine (log上でほぼ均等に;UGF付近の重点的な測定 5h)
    • A and C measurements (1h)
    • Actuator TF measurement (Y単独, 30min)
    • Y-end PCAL injection for time delay (Swept sine, 30min)
    • CAL line (22Hz以下; 30min, 事前に)

KAGRA/Subgroups/CAL/CAL_Meeting/20200212 (last edited 2020-02-12 19:42:05 by YukiInoue)