2020/2/12
18:00 JST (Japan) 17:00 CST (Taiwan) 10:00 CET (Geneva)
- Report of Task managers
- Review document
- Contents of CAL day
- WSK measurement (3.5h)
- FSM (3.5h)
- A and C measurements (1h)
- Swept sine (log上でほぼ均等に;UGF付近の重点的な測定 5h)
- A and C measurements (1h)
- Actuator TF measurement (Y単独, 30min)
- Y-end PCAL injection for time delay (Swept sine, 30min)
- CAL line (22Hz以下; 30min, 事前に)