Size: 480
Comment:
|
← Revision 3 as of 2020-02-12 19:42:05 ⇥
Size: 479
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 9: | Line 9: |
* Swept sine (log上でほぼ均等に;UGF付近の重点的な測定 5h) | * Swept sine (log上でほぼ均等に;UGF付近の重点的な測定 5h) |
2020/2/12
18:00 JST (Japan) 17:00 CST (Taiwan) 10:00 CET (Geneva)
- Report of Task managers
- Review document
- Contents of CAL day
- WSK measurement (3.5h)
- FSM (3.5h)
- A and C measurements (1h)
- Swept sine (log上でほぼ均等に;UGF付近の重点的な測定 5h)
- A and C measurements (1h)
- Actuator TF measurement (Y単独, 30min)
- Y-end PCAL injection for time delay (Swept sine, 30min)
- CAL line (22Hz以下; 30min, 事前に)