⇤ ← Revision 1 as of 2020-02-19 18:02:23
Size: 352
Comment:
|
Size: 352
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
* Result of sine measurement (Inoue: 5min) | * Result of sign measurement (Inoue: 5min) |
2020/2/19
18:00 JST (Japan) 17:00 CST (Taiwan) 10:00 CET (Geneva)
- Schedule of CAL day(Inoue: 15min)
Plan of free swinging Michelson(Yamamoto:10min)
- CAL review (Inoue: 10min)
- Preparation of Low latency(Darkhan or Sawada: 10min)
- Pcal parameters (Ko-Han; 15min)
- Result of sign measurement (Inoue: 5min)
- calibration shift