Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2020-02-19 18:02:23
Size: 352
Editor: YukiInoue
Comment:
Revision 5 as of 2020-02-19 20:28:58
Size: 582
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 * Result of sine measurement (Inoue: 5min)  * Result of sign measurement (Inoue: 5min)
Line 10: Line 10:
  * 2/25(Tue.) [Ogaki・Inoue]
  * 3/3 (Tue.) [Ogaki・Darkhan]
  * 3/10(Tue.) [Yamamoto・Darkhan・Ito?]
  * 3/17(Tue.) [Remote from Lake Geneva]
  * 3/24(Tue.) [Yamamoto・???]
  * 3/31(Tue.) [Yamomoto・???]

2020/2/19

18:00 JST (Japan) 17:00 CST (Taiwan) 10:00 CET (Geneva)

  • Schedule of CAL day(Inoue: 15min)
  • Plan of free swinging Michelson(Yamamoto:10min)

  • CAL review (Inoue: 10min)
  • Preparation of Low latency(Darkhan or Sawada: 10min)
  • Pcal parameters (Ko-Han; 15min)
  • Result of sign measurement (Inoue: 5min)
  • calibration shift
    • 2/25(Tue.) [Ogaki・Inoue]
    • 3/3 (Tue.) [Ogaki・Darkhan]
    • 3/10(Tue.) [Yamamoto・Darkhan・Ito?]
    • 3/17(Tue.) [Remote from Lake Geneva]
    • 3/24(Tue.) [Yamamoto・???]
    • 3/31(Tue.) [Yamomoto・???]

KAGRA/Subgroups/CAL/CAL_Meeting/20200219 (last edited 2020-02-19 20:28:58 by YukiInoue)