Size: 352
Comment:
|
Size: 562
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
2/25(Tue.) [Ogaki・Inoue] 3/3 (Tue.) [OGAKI(?)・???] 3/10(Tue.) [Yamamoto・???] 3/17(Tue.) [Remote from Lake Geneva] 3/24(Tue.) [Yamamoto・???] 3/31(Tue.) [Yamomoto・???] |
2020/2/19
18:00 JST (Japan) 17:00 CST (Taiwan) 10:00 CET (Geneva)
- Schedule of CAL day(Inoue: 15min)
Plan of free swinging Michelson(Yamamoto:10min)
- CAL review (Inoue: 10min)
- Preparation of Low latency(Darkhan or Sawada: 10min)
- Pcal parameters (Ko-Han; 15min)
- Result of sign measurement (Inoue: 5min)
- calibration shift
2/25(Tue.) [Ogaki・Inoue] 3/3 (Tue.) [OGAKI(?)・???] 3/10(Tue.) [Yamamoto・???] 3/17(Tue.) [Remote from Lake Geneva] 3/24(Tue.) [Yamamoto・???] 3/31(Tue.) [Yamomoto・???]