Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
* Improve the measured points * Do we need the quick analysis for commissioning break? |
|
Line 5: | Line 7: |
* HF OMC effect * Pcal requiere 61usec x3? * Consistency check with L_A. |
|
Line 6: | Line 11: |
* updates of Low latency (S.Takahiro) | * Consistency check of h(t) * Updates of Low latency (S.Takahiro) |
Line 8: | Line 14: |
* Goal * Installation of the Gcal systems * NCU Gcal was developed. We shiped the system to AS today. * Feng-kai, Chang-I joined KAGRA officially. They will come Japan for instllation work (1st visit: May, Second visit: July). Depend on the corona virses problem. * Fixing the Y-end Pcal optics -> Depend on the timing of chamber opening * Noise probrem of X-end PCAL -> independent task from IFO * Escitation port? We should charactarize it after we install new OFS and 20bit DAQ system. * Improvement of OFS -> independent task from IFO * Installed to NCU and Toyama uni. for Charactarization: Ko-Han and Ito * Shift |
|
Line 12: | Line 28: |
* WSK measurement? |
2020/3/9
17:00 JST (Japan) 16:00 CST (Taiwan) 9:00 CET (Geneva)
- Discussion of maintenance day plan 16:00-17:00 [Yamamoto・Darkhan]
- Improve the measured points
- Do we need the quick analysis for commissioning break?
- Summary of CAL analysis meeting(Yuki)
- HF OMC effect
- Pcal requiere 61usec x3?
- Consistency check with L_A.
- Status of KAGRA observation and commissioning break (Takahiro)
- Consistency check of h(t)
- Updates of Low latency (S.Takahiro)
- Preparing of O4(Yuki)
- Goal
- Installation of the Gcal systems
- NCU Gcal was developed. We shiped the system to AS today.
- Feng-kai, Chang-I joined KAGRA officially. They will come Japan for instllation work (1st visit: May, Second visit: July). Depend on the corona virses problem.
Fixing the Y-end Pcal optics -> Depend on the timing of chamber opening
Noise probrem of X-end PCAL -> independent task from IFO
- Escitation port? We should charactarize it after we install new OFS and 20bit DAQ system.
Improvement of OFS -> independent task from IFO
- Installed to NCU and Toyama uni. for Charactarization: Ko-Han and Ito
- Installation of the Gcal systems
- Goal
- Shift
- 2/25(Tue.) [Ogaki・Inoue]
- 3/3 (Tue.) [Ogaki・Darkhan]
- 3/10 (Tue.) [Yamamoto・Darkhan・Yuki (remote)]
- 3/24 CAL day(Tue.) [Yamamoto・Darkhan]
- WSK measurement?
- 3/31(Tue.) [Yamomoto・Darkhan]