Differences between revisions 3 and 10 (spanning 7 versions)
Revision 3 as of 2020-03-09 17:16:53
Size: 1497
Editor: YukiInoue
Comment:
Revision 10 as of 2020-03-09 18:40:41
Size: 1952
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
  * Improve the measured points
  * Do we need the quick analysis for commissioning break?
  * Improve the measured points (Inoue)
  * Do we need the quick analysis for commissioning break?-> dont need it. (Yamamoto-san)
Line 8: Line 8:
  * Pcal requiere 61usec x3?   * Pcal requiere 61usec x3?-> 61usec x2
Line 10: Line 10:
 * Status of KAGRA observation and commissioning break (Takahiro)
 * Consistency check of h(t)
 * Status of KAGRA observation and commissioning break (Y.Takahiro)
 * Consistency check of h(t) (Y.Takahiro)
  * Offline analysis(C00<->C01<->C10<->C20; S.Takahiro or Darkhan?)
  * Comparing with Rx module (Analysis of last week measurement: Inoue)
Line 23: Line 25:
   * Instllation of Backup Server
   * Measurement of upper suspension driver, Low temperature effect
   * Offline analysis for O3b catalog paper.
Line 26: Line 31:
  * 3/10 (Tue.) [Yamamoto・Darkhan・Yuki (remote)]
  * 3/24 CAL day(Tue.) [Yamamoto・Darkhan]
  * WSK measurement?

  * 3/31(Tue.) [Yamomoto・Darkhan]
  * 3/10 (Tue.) [Yamamoto・Darkhan・Sawada]
  * 3/17 WSK measurement [Yamamoto,Darkhan
]
  * 3/24 CAL day(Tue.) [Yamamoto・Darkhan・Yuki (remote)]
   * 3/16 Discussion of CAL day contents 17:00-

  * 3/31(Tue.) [Yamomoto・Darkhan・Yuki (remote)]

2020/3/9

17:00 JST (Japan) 16:00 CST (Taiwan) 9:00 CET (Geneva)

  • Discussion of maintenance day plan 16:00-17:00 [Yamamoto・Darkhan]
    • Improve the measured points (Inoue)
    • Do we need the quick analysis for commissioning break?-> dont need it. (Yamamoto-san)

  • Summary of CAL analysis meeting(Yuki)slide

    • HF OMC effect
    • Pcal requiere 61usec x3?-> 61usec x2

    • Consistency check with L_A.
  • Status of KAGRA observation and commissioning break (Y.Takahiro)
  • Consistency check of h(t) (Y.Takahiro)
    • Offline analysis(C00<->C01<->C10<->C20; S.Takahiro or Darkhan?)

    • Comparing with Rx module (Analysis of last week measurement: Inoue)
  • Updates of Low latency (S.Takahiro)
  • Preparing of O4(Yuki)
    • Goal
      • Installation of the Gcal systems
        • NCU Gcal was developed. We shiped the system to AS today.
        • Feng-kai, Chang-I joined KAGRA officially. They will come Japan for instllation work (1st visit: May, Second visit: July). Depend on the corona virses problem.
      • Fixing the Y-end Pcal optics -> Depend on the timing of chamber opening

      • Noise probrem of X-end PCAL -> independent task from IFO

        • Escitation port? We should charactarize it after we install new OFS and 20bit DAQ system.
      • Improvement of OFS -> independent task from IFO

        • Installed to NCU and Toyama uni. for Charactarization: Ko-Han and Ito
      • Instllation of Backup Server
      • Measurement of upper suspension driver, Low temperature effect
      • Offline analysis for O3b catalog paper.
  • Shift
    • 2/25(Tue.) [Ogaki・Inoue]
    • 3/3 (Tue.) [Ogaki・Darkhan]
    • 3/10 (Tue.) [Yamamoto・Darkhan・Sawada]
    • 3/17 WSK measurement [Yamamoto,Darkhan]
    • 3/24 CAL day(Tue.) [Yamamoto・Darkhan・Yuki (remote)]
      • 3/16 Discussion of CAL day contents 17:00-
    • 3/31(Tue.) [Yamomoto・Darkhan・Yuki (remote)]

KAGRA/Subgroups/CAL/CAL_Meeting/20200309 (last edited 2020-03-09 18:40:41 by YukiInoue)