= 2020/3/9 = 17:00 JST (Japan) 16:00 CST (Taiwan) 9:00 CET (Geneva) * Discussion of maintenance day plan 16:00-17:00 [Yamamoto・Darkhan] * Improve the measured points (Inoue) * Do we need the quick analysis for commissioning break?-> dont need it. (Yamamoto-san) * Summary of CAL analysis meeting(Yuki)[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11536|slide]] * HF OMC effect * Pcal requiere 61usec x3?-> 61usec x2 * Consistency check with L_A. * Status of KAGRA observation and commissioning break (Y.Takahiro) * Consistency check of h(t) (Y.Takahiro) * Offline analysis(C00<->C01<->C10<->C20; S.Takahiro or Darkhan?) * Comparing with Rx module (Analysis of last week measurement: Inoue) * Updates of Low latency (S.Takahiro) * Preparing of O4(Yuki) * Goal * Installation of the Gcal systems * NCU Gcal was developed. We shiped the system to AS today. * Feng-kai, Chang-I joined KAGRA officially. They will come Japan for instllation work (1st visit: May, Second visit: July). Depend on the corona virses problem. * Fixing the Y-end Pcal optics -> Depend on the timing of chamber opening * Noise probrem of X-end PCAL -> independent task from IFO * Escitation port? We should charactarize it after we install new OFS and 20bit DAQ system. * Improvement of OFS -> independent task from IFO * Installed to NCU and Toyama uni. for Charactarization: Ko-Han and Ito * Instllation of Backup Server * Measurement of upper suspension driver, Low temperature effect * Offline analysis for O3b catalog paper. * Shift * 2/25(Tue.) [Ogaki・Inoue] * 3/3 (Tue.) [Ogaki・Darkhan] * 3/10 (Tue.) [Yamamoto・Darkhan・Sawada] * 3/17 WSK measurement [Yamamoto,Darkhan] * 3/24 CAL day(Tue.) [Yamamoto・Darkhan・Yuki (remote)] * 3/16 Discussion of CAL day contents 17:00- * 3/31(Tue.) [Yamomoto・Darkhan・Yuki (remote)]