Differences between revisions 2 and 5 (spanning 3 versions)
Revision 2 as of 2020-03-16 16:55:02
Size: 691
Editor: YukiInoue
Comment:
Revision 5 as of 2020-03-16 16:57:57
Size: 848
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
     * GSK is put on 3F in Kamioka building.
     * For the Rx path1 measurement, we need to use the stainless steel spacer.
     * Please reconnect the Pico motor connector.
Line 12: Line 15:
3/17 WSK measurement [Yamamoto,Darkhan]
3/24 CAL day(Tue.) [Yamamoto・Darkhan・Yuki (remote)]
3/16 Discussion of CAL day contents 17:00-
3/31(Tue.) [Yamomoto・Darkhan・Yuki (remote)]
 * 3/17 WSK measurement [Yamamoto,Darkhan]
 * 3/24 CAL day(Tue.) [Yamamoto・Darkhan・Yuki (remote:16:10-)]
 * 3/31(Tue.) [Yamomoto・Darkhan・Yuki (remote:16:10-)]

2020/03/16

  • Agenda
    • Plans of Cal day and WSK measurement tomorrow
      • GSK is put on 3F in Kamioka building.
      • For the Rx path1 measurement, we need to use the stainless steel spacer.
      • Please reconnect the Pico motor connector.
    • Update of online model (Yamamoto)
    • Result of comparison between C00 and C01 (Sawada or Darkhan).
    • Discussion based on 3 weeks measurement (Yuki)


Shift

  • 3/17 WSK measurement [Yamamoto,Darkhan]
  • 3/24 CAL day(Tue.) [Yamamoto・Darkhan・Yuki (remote:16:10-)]
  • 3/31(Tue.) [Yamomoto・Darkhan・Yuki (remote:16:10-)]

KAGRA/Subgroups/CAL/CAL_Meeting/20200316 (last edited 2020-03-16 18:21:56 by YukiInoue)