Differences between revisions 6 and 7
Revision 6 as of 2020-03-16 16:58:22
Size: 860
Editor: YukiInoue
Comment:
Revision 7 as of 2020-03-16 18:21:56
Size: 1322
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
   * Inoue: Task scheduler, meeting
     * Yamamoto: FSM, measurement files(1-7)
     * Sawada: Injection; Sine gauss, Duo tone
     * Pcal 15usec (after O3)
     * Oplev check
     * 1-11 -> set parameter -> C00/Rx: X-end + Yend -> Injection ? (3.5h+0.5h+1h+1h: 8h)
Line 11: Line 17:
    * Discussion based on 3 weeks measurement (Yuki)
Line 12: Line 19:
    * Discussion based on 3 weeks measurement (Yuki)
    * CAL review
      * UTC Mar 17 7:00 - 11:00= JST Mar 17 16:00-20:00 =PST Mar 16 23:00-Mar 17 3:00
      * UTC Mar 17 17:00 -20:00= JST Mar 18 2:00-6:00 = Mar 17 PST 9:00-13:00

2020/03/16

  • Agenda
    • Plans of WSK measurement tomorrow
      • GSK is put on 3F in Kamioka building.
      • For the Rx path1 measurement, we need to use the stainless steel spacer.
      • Please reconnect the Pico motor connector.
    • Plans of Cal day
    • Inoue: Task scheduler, meeting
      • Yamamoto: FSM, measurement files(1-7)
      • Sawada: Injection; Sine gauss, Duo tone
      • Pcal 15usec (after O3)
      • Oplev check
      • 1-11 -> set parameter -> C00/Rx: X-end + Yend -> Injection ? (3.5h+0.5h+1h+1h: 8h)

      • Update of online model (Yamamoto)
      • Discussion based on 3 weeks measurement (Yuki)
      • Result of comparison between C00 and C01 (Sawada or Darkhan).
      • CAL review
        • UTC Mar 17 7:00 - 11:00= JST Mar 17 16:00-20:00 =PST Mar 16 23:00-Mar 17 3:00
        • UTC Mar 17 17:00 -20:00= JST Mar 18 2:00-6:00 = Mar 17 PST 9:00-13:00


Shift

  • 3/17 WSK measurement [Yamamoto,Darkhan]
  • 3/24 CAL day(Tue.) [Yamamoto・Darkhan・Yuki (remote:16:10-)]
  • 3/31(Tue.) [Yamomoto・Darkhan・Yuki (remote:16:10-)]

KAGRA/Subgroups/CAL/CAL_Meeting/20200316 (last edited 2020-03-16 18:21:56 by YukiInoue)