Size: 860
Comment:
|
← Revision 7 as of 2020-03-16 18:21:56 ⇥
Size: 1322
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
* Inoue: Task scheduler, meeting * Yamamoto: FSM, measurement files(1-7) * Sawada: Injection; Sine gauss, Duo tone * Pcal 15usec (after O3) * Oplev check * 1-11 -> set parameter -> C00/Rx: X-end + Yend -> Injection ? (3.5h+0.5h+1h+1h: 8h) |
|
Line 11: | Line 17: |
* Discussion based on 3 weeks measurement (Yuki) | |
Line 12: | Line 19: |
* Discussion based on 3 weeks measurement (Yuki) |
* CAL review * UTC Mar 17 7:00 - 11:00= JST Mar 17 16:00-20:00 =PST Mar 16 23:00-Mar 17 3:00 * UTC Mar 17 17:00 -20:00= JST Mar 18 2:00-6:00 = Mar 17 PST 9:00-13:00 |
2020/03/16
- Agenda
- Plans of WSK measurement tomorrow
- GSK is put on 3F in Kamioka building.
- For the Rx path1 measurement, we need to use the stainless steel spacer.
- Please reconnect the Pico motor connector.
- Plans of Cal day
- Inoue: Task scheduler, meeting
- Yamamoto: FSM, measurement files(1-7)
- Sawada: Injection; Sine gauss, Duo tone
- Pcal 15usec (after O3)
- Oplev check
1-11 -> set parameter -> C00/Rx: X-end + Yend -> Injection ? (3.5h+0.5h+1h+1h: 8h)
- Update of online model (Yamamoto)
- Discussion based on 3 weeks measurement (Yuki)
- Result of comparison between C00 and C01 (Sawada or Darkhan).
- CAL review
- UTC Mar 17 7:00 - 11:00= JST Mar 17 16:00-20:00 =PST Mar 16 23:00-Mar 17 3:00
- UTC Mar 17 17:00 -20:00= JST Mar 18 2:00-6:00 = Mar 17 PST 9:00-13:00
- Plans of WSK measurement tomorrow
Shift
- 3/17 WSK measurement [Yamamoto,Darkhan]
- 3/24 CAL day(Tue.) [Yamamoto・Darkhan・Yuki (remote:16:10-)]
- 3/31(Tue.) [Yamomoto・Darkhan・Yuki (remote:16:10-)]