Differences between revisions 2 and 6 (spanning 4 versions)
Revision 2 as of 2020-03-30 16:40:41
Size: 303
Editor: YukiInoue
Comment:
Revision 6 as of 2020-03-30 18:25:34
Size: 1295
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= 2020/03/16 = = 2020/03/30 =
Line 4: Line 4:
   * Coil measurement
   * FSM
   * Weekly calibration
   * Fix the parameter
   * h(t)/PCAL consistency check
   * timing injection test
    * Open loop measurement
    * Closed loop measurement
    * 2h line test
   * Swept sine measurement
   * 2h stable (kappa and characterization of C10)
Line 8: Line 19:
  * Progress of Homework3 (Duotone-> Yuki, Swept sine -> Sawada)   * Progress of Homework3 (Duotone-> Yuki, Swept sine -> Sawada)[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ListBy?typeid=2|slide]]


Homework 1 :Error budget
 * Check 1h or 2h data (60sec averaged data for kappas and fc).
Homework 2 :comparison b/w C10 and C00
 * Apr.2 absent(Sawada)
 * C10/C00-> Check the FIR and IIR model
 * C10 power spectrum -> Web based monitor (1 week)
Homework 3 :Injection test related with timing and time delay
 * Already prepared sine gauss template
  * Channel (ETMX, ETMY, DARM2, Pcal_Exc)
  * SNR(Pcal->4V, XY,X,Y-> template of swept sine)
 * Analysis
  * We need to check.
  * April 1 or 2
   * Alignment, Weekly calibration
Homework 4 :Consistency check of h(t)/PCAL_X and h(t)/PCAL_Y

2020/03/30

  • Agenda
    • Discussion of CAL day contents (All)
      • Coil measurement
      • FSM
      • Weekly calibration
      • Fix the parameter
      • h(t)/PCAL consistency check
      • timing injection test
        • Open loop measurement
        • Closed loop measurement
        • 2h line test
      • Swept sine measurement
      • 2h stable (kappa and characterization of C10)
    • Update of online model errors (Yamamoto)
    • Measurement of filter in the tunnel (Yamamoto)
    • Progress of Homework1 (Yuki)
    • Progress of Homework2 (Sawada)
    • Progress of Homework3 (Duotone-> Yuki, Swept sine -> Sawada)slide

Homework 1 :Error budget

  • Check 1h or 2h data (60sec averaged data for kappas and fc).

Homework 2 :comparison b/w C10 and C00

  • Apr.2 absent(Sawada)
  • C10/C00-> Check the FIR and IIR model

  • C10 power spectrum -> Web based monitor (1 week)

Homework 3 :Injection test related with timing and time delay

  • Already prepared sine gauss template
    • Channel (ETMX, ETMY, DARM2, Pcal_Exc)
    • SNR(Pcal->4V, XY,X,Y-> template of swept sine)

  • Analysis
    • We need to check.
    • April 1 or 2
      • Alignment, Weekly calibration

Homework 4 :Consistency check of h(t)/PCAL_X and h(t)/PCAL_Y

KAGRA/Subgroups/CAL/CAL_Meeting/20200330 (last edited 2020-03-30 18:25:34 by YukiInoue)