Size: 383
Comment:
|
Size: 732
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= 2020/03/16 = | = 2020/03/30 = |
Line 9: | Line 9: |
Homework 1 :Error budget * Check 1h or 2h data (60sec averaged data for kappas and fc). Homework 2 :comparison b/w C10 and C00 * Apr.2 absent(Sawada) * C10/C00-> Check the FIR and IIR model * C10 powerspectrum Homework 3 :Injection test related with timing and time delay Homework 4 :Consistency check of h(t)/PCAL_X and h(t)/PCAL_Y |
2020/03/30
- Agenda
- Discussion of CAL day contents (All)
- Update of online model errors (Yamamoto)
- Measurement of filter in the tunnel (Yamamoto)
- Progress of Homework1 (Yuki)
- Progress of Homework2 (Sawada)
Progress of Homework3 (Duotone-> Yuki, Swept sine -> Sawada)slide
Homework 1 :Error budget
- Check 1h or 2h data (60sec averaged data for kappas and fc).
Homework 2 :comparison b/w C10 and C00
- Apr.2 absent(Sawada)
C10/C00-> Check the FIR and IIR model
- C10 powerspectrum
Homework 3 :Injection test related with timing and time delay Homework 4 :Consistency check of h(t)/PCAL_X and h(t)/PCAL_Y