Differences between revisions 1 and 6 (spanning 5 versions)
Revision 1 as of 2020-04-20 16:58:52
Size: 812
Editor: YukiInoue
Comment:
Revision 6 as of 2020-04-20 17:07:41
Size: 547
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
   * 初日[4/21]
    * 13-8(pcal)、1-7(FSM)、8-11(pcal) [目標9-17]
    * Observing modeと同等でロックキープ(パラメタアップデート待ち。1-2時間?)
    * C10/C00評価用のクリーンなデータ取得(30分くらいあれば十分?)
    * duotone測定(2時間くらい?)
    * 1-13番のやり直しと追加測定の要・不要判断 [深夜]
   * 二日目[4/22] (初日測定のやり直しが不要なら)
    * 念のため
OLTF測定 [早朝]
    * HW Injection [午前]
    * GSK測定 + HW Injectionやり直しの要・不要判断 [午後]
   * Day 1[Apr.21]
    * 13-8(pcal)、1-7(FSM)、8-11(pcal) [Goal: Goal: 9:00-17:00]
    * Observing mode(We need to wait the parameter update。1-2 hour?)
    * C10/C00 neasurement(30 min?)
    * duotone(2 hour?)
    * 1-13: re-measurement? [Midnight]
   * Day 2[Apr. 22]
    *
OLTF [Early morning]
    * HW Injection [AM]
    * GSK + HW Injection [PM]
Line 16: Line 16:
  * 三日目(基本予備日)[4/23]
   * 最終確認8-11(pcal) [午前]
  * Day3(Backup day)[Apr.23]
    * 8-11(pcal) [AM]

2020/04/13

  • Agenda
    • All: Discussion of CAL days (5 days)
      • Day 1[Apr.21]
        • 13-8(pcal)、1-7(FSM)、8-11(pcal) [Goal: Goal: 9:00-17:00]
        • Observing mode(We need to wait the parameter update。1-2 hour?)
        • C10/C00 neasurement(30 min?)
        • duotone(2 hour?)
        • 1-13: re-measurement? [Midnight]
      • Day 2[Apr. 22]
        • OLTF [Early morning]
        • HW Injection [AM]
        • GSK + HW Injection [PM]
      • Day3(Backup day)[Apr.23]
        • 8-11(pcal) [AM]
  • Yuki: Duotone injection
  • Sawada: C00/C10

KAGRA/Subgroups/CAL/CAL_Meeting/20200420 (last edited 2020-04-20 17:38:29 by YukiInoue)