Size: 541
Comment:
|
← Revision 8 as of 2020-04-20 17:38:29 ⇥
Size: 673
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
* 13-8(pcal)、1-7(FSM)、8-11(pcal) [Goal: 9:00-17:00] * Observing mode(We need to wait the parameter update。1-2 hour?) * C10/C00 neasurement(30 min?) |
* 13-8(pcal)、1-7(FSM)、8-11(pcal) [Goal: 9:00-15:00] * CAL Parameter analysis: Yuki * CAL Parameter update for C00,C10: Yamamoto, Darkhan, Sawada * Observing mode(We need to wait the parameter update。2 hour) * 8-11(pcal) * CAL Parameter analysis: Yuki |
Line 10: | Line 13: |
Line 13: | Line 17: |
* GSK + HW Injection [PM] |
* GSK + HW Injection [PM] :Darkhan + Yamamoto |
2020/04/13
- Agenda
- All: Discussion of CAL days (5 days)
- Day 1[Apr.21]
- 13-8(pcal)、1-7(FSM)、8-11(pcal) [Goal: 9:00-15:00]
- CAL Parameter analysis: Yuki
- CAL Parameter update for C00,C10: Yamamoto, Darkhan, Sawada
- Observing mode(We need to wait the parameter update。2 hour)
- 8-11(pcal)
- CAL Parameter analysis: Yuki
- duotone(2 hour?)
- 1-13: re-measurement? [Midnight]
- Day 2[Apr. 22]
- OLTF [Early morning]
- HW Injection [AM]
- GSK + HW Injection [PM] :Darkhan + Yamamoto
- Day3(Backup day)[Apr.23]
- 8-11(pcal) [AM]
- Day 1[Apr.21]
- All: Discussion of CAL days (5 days)
- Yuki: Duotone injection
- Sawada: C00/C10