* Calibration parameter (Time delay,G_res) * kappaの計算 * FIR filter * When?: 1 month (End of May) |
|
Line 6: | Line 10: |
* Swept sine (Yuki) * 17usec (Yuki) * Sine gauss (Sawada) * FSM (Yamamoto) * Duotone (Yuki) * Free run (Yamamoto, Sawada, C00/C10, kappa) * PCAL cross calibration (Yuki and Chen-Dan) |
|
Line 8: | Line 19: |
7. time-dependent correction | 7. time-dependent correction(Sawada) |
Line 10: | Line 21: |
* 1 or 2 month until O3c |
- = CAL meeting =
- Plans of this 2 month (Yuki)
- Publications
- C20 relese plan
- Calibration parameter (Time delay,G_res)
- kappaの計算
- FIR filter
- When?: 1 month (End of May)
- Summary of CAL day measurement (Yamamoto)
- Swept sine (Yuki)
- 17usec (Yuki)
- Sine gauss (Sawada)
- FSM (Yamamoto)
- Duotone (Yuki)
- Free run (Yamamoto, Sawada, C00/C10, kappa)
- PCAL cross calibration (Yuki and Chen-Dan)
- C00/C10 (Sawada)
- Solution of Time delay puzzle (Yuki)
- time-dependent correction(Sawada)
- CAL state vector. (short)
- 1 or 2 month until O3c