= CAL meeting 2020 June. 1 = * Yuki: Analysis of Duotone injection * Sawada: Crosscheck of sign with calibration line * Yuki: C20 server in NCU * Sawada: Current status of C20 pipeline * Chen Dan: Picture analysis for beam position monitor * All: Discussion of JPS meeting --------------------------------- = Memo = * Action item for C20 * Analysis of Duotone for stable data (Yuki) * Analysis of Pcal lines (Sawada) * Data transfer (Sawada: Ongoing) * C00-C11-C20 (Sawada) * Time dependent factor (h(t),h_err,h_ctrl) * Error estimation * Action item fot C21 * Beam position (Chen-Dan) * H_PCAL * WSK effect * JPS discussion * Overview(O3GK summary): Yuki * Reconstruction: Sawada