Line 14: Line 14:
   * 36Hz with long time accumlation time. -> Yuki
   * C20 produciton also start in pallarel. But, pertial. -> Sawada-san
   * 36Hz with long time accumulation time. -> Yuki
   * C20 production also starts in plural. But, partial. -> Sawada-san

CAL meeting 20200608

  • Yuki & S.Takahiro Final decision of C20 h(t)

    • Duotone 36Hz and 960Hz are inconsistnt.
    • Duotone and Pcal-XY timedelay are inconsistent.
    • Pcal-XY time delay and Swept sine injection are consistent within 1 sigma error.
    • herr/C00 and hctrl/C00 is also consistent.
    • Mod_Fil include S-Z.
    • Mod_Fil include resG29().
    • 5 days parameter estimation wiht swept sine.
    • Action items
      • Filter list in document -> Yuki and Sawada

        • Actual response of filters (FIR in pipline)
      • 36Hz with long time accumulation time. -> Yuki

      • C20 production also starts in plural. But, partial. -> Sawada-san

      • 2 weeks time trend data -> Sawada-san

      • Caliblation error -> Yuki

  • Yuki: Action item list for C21 (Deadline: End of August(Before LVK meeting))
    • Followings are list of update.
      • Time correction (Sawada?)
      • Data analysis of injection test (Sawada?)
      • 17usec problem (Site: Yamamoto, Chen-Dan?)
      • Time trend of WSK (Ko-Han and Ito?)
      • Estimation of H_PCAL (Yuki?)
      • Beam position (Chen-Dan?)
      • Improvement of the measured filter parameters (Steven & Hsiang-Yu?)

  • Sawada: Current status of C20 h(t) production
  • Yuki: Shipping of GCAL (Mid. July?; week of June 15 level-1 -> level-0.5)

  • Chen-Dan-san will explain the site work plan.