Differences between revisions 2 and 3
Revision 2 as of 2020-06-08 16:57:54
Size: 566
Editor: YukiInoue
Comment:
Revision 3 as of 2020-06-08 16:58:19
Size: 593
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
 = CAL meeting 20200608 =
  • = CAL meeting 20200608 =
  • Yuki & S.Takahiro Final decision of C20 h(t)

  • Yuki: Action item list for C21 (Deadline: End of August(Before LVK meeting))
    • Followings are list of update.
      • Time correction (Sawada?)
      • Data analysis of injection test (Sawada?)
      • 17sec problem (Site: Yamamoto, Chen-Dan?)
      • Time trend of WSK (Ko-Han and Ito?)
      • Estimation of H_PCAL (Yuki?)
      • Beam position (Chen-Dan?)
      • Improvement of the measured filter parameters (Steven & Hsiang-Yu?)

  • Sawada: Current status of C20 h(t) production
  • Yuki: Shipping of GCAL(Mid. July?)

KAGRA/Subgroups/CAL/CAL_Meeting/20200608 (last edited 2020-07-18 21:51:45 by YukiInoue)