Size: 593
Comment:
|
Size: 592
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= CAL meeting 20200608 = | = CAL meeting 20200608 = |
CAL meeting 20200608
Yuki & S.Takahiro Final decision of C20 h(t)
- Yuki: Action item list for C21 (Deadline: End of August(Before LVK meeting))
- Followings are list of update.
- Time correction (Sawada?)
- Data analysis of injection test (Sawada?)
- 17sec problem (Site: Yamamoto, Chen-Dan?)
- Time trend of WSK (Ko-Han and Ito?)
- Estimation of H_PCAL (Yuki?)
- Beam position (Chen-Dan?)
Improvement of the measured filter parameters (Steven & Hsiang-Yu?)
- Followings are list of update.
- Sawada: Current status of C20 h(t) production
- Yuki: Shipping of GCAL(Mid. July?)