Differences between revisions 5 and 6
Revision 5 as of 2020-06-08 18:01:17
Size: 878
Editor: YukiInoue
Comment:
Revision 6 as of 2020-06-08 18:04:07
Size: 931
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
  * Duotone and Pcal-XY timedelay are inconsistent.

CAL meeting 20200608

  • Yuki & S.Takahiro Final decision of C20 h(t)

    • Duotone 36Hz and 960Hz are inconsistnt.
    • Duotone and Pcal-XY timedelay are inconsistent.
    • Pcal-XY time delay and Swept sine injection are consistent within 1 sigma error.
    • herr/C00 and hctrl/C00 is also consistent.
    • Mod_Fil include S-Z.
    • Mod_Fil include resG29().
    • 5 days parameter estimation wiht swept sine.
  • Yuki: Action item list for C21 (Deadline: End of August(Before LVK meeting))
    • Followings are list of update.
      • Time correction (Sawada?)
      • Data analysis of injection test (Sawada?)
      • 17sec problem (Site: Yamamoto, Chen-Dan?)
      • Time trend of WSK (Ko-Han and Ito?)
      • Estimation of H_PCAL (Yuki?)
      • Beam position (Chen-Dan?)
      • Improvement of the measured filter parameters (Steven & Hsiang-Yu?)

  • Sawada: Current status of C20 h(t) production
  • Yuki: Shipping of GCAL(Mid. July?)

KAGRA/Subgroups/CAL/CAL_Meeting/20200608 (last edited 2020-07-18 21:51:45 by YukiInoue)