Size: 1042
Comment:
|
Size: 1078
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
--------------- | |
Line 13: | Line 13: |
* Actual response of filters (FIR in pipline) |
CAL meeting 20200608
Yuki & S.Takahiro Final decision of C20 h(t)
- Duotone 36Hz and 960Hz are inconsistnt.
- Duotone and Pcal-XY timedelay are inconsistent.
- Pcal-XY time delay and Swept sine injection are consistent within 1 sigma error.
- herr/C00 and hctrl/C00 is also consistent.
- Mod_Fil include S-Z.
- Mod_Fil include resG29().
- 5 days parameter estimation wiht swept sine.
- Action item
- Filter list in document
- Actual response of filters (FIR in pipline)
- 36Hz with long time accumlation time.
- Filter list in document
- Yuki: Action item list for C21 (Deadline: End of August(Before LVK meeting))
- Followings are list of update.
- Time correction (Sawada?)
- Data analysis of injection test (Sawada?)
- 17sec problem (Site: Yamamoto, Chen-Dan?)
- Time trend of WSK (Ko-Han and Ito?)
- Estimation of H_PCAL (Yuki?)
- Beam position (Chen-Dan?)
Improvement of the measured filter parameters (Steven & Hsiang-Yu?)
- Followings are list of update.
- Sawada: Current status of C20 h(t) production
- Yuki: Shipping of GCAL(Mid. July?)