= CAL meeting 20200608 = * Yuki & S.Takahiro Final decision of C20 h(t) * Duotone 36Hz and 960Hz are inconsistnt. * Duotone and Pcal-XY timedelay are inconsistent. * Pcal-XY time delay and Swept sine injection are consistent within 1 sigma error. * herr/C00 and hctrl/C00 is also consistent. * Mod_Fil include S-Z. * Mod_Fil include resG29(). * 5 days parameter estimation wiht swept sine. * Action items * Filter list in document -> Yuki and Sawada * Actual response of filters (FIR in pipline) * 36Hz with long time accumulation time. -> Yuki * C20 production also starts in parallel. But, partial. -> Sawada-san * 2 weeks time trend data -> Sawada-san * Caliblation error -> Yuki * Yuki: Action item list for C21 (Deadline: End of August(Before LVK meeting)) * Followings are list of update. * Time correction (Sawada?) * Data analysis of injection test (Sawada?) * 17usec problem (Site: Yamamoto, Chen-Dan?) * Time trend of WSK (Ko-Han and Ito?) * Estimation of H_PCAL (Yuki?) * Beam position (Chen-Dan?) * Improvement of the measured filter parameters (Steven & Hsiang-Yu?) * Sawada: Current status of C20 h(t) production * Yuki: Shipping of GCAL (Mid. July?; week of June 15 level-1 -> level-0.5) * Chen-Dan-san will explain the site work plan.