== CAL Meeting on 2016/9/28 15:00 - 16:40 == Participants: Kanda, Yamamoto, Kokeyama, Suzuki, Tomaru, Inoue, Ushiba, Miyamoto(CRYp), Haino * Next meeting will be around 10/20-11/8 (to be determined) === Minutes === * Rick's visit of Kashiwa (8/31-9/15) and Kamioka (9/9-10) - Inoue * Visited of X-end * Discussed on - * Periscope design (EXA chamber) * Power standard (Tomaru-san) * Camera * Elastic deformation (LIGO -> KAGRA) * LIGO Pcal+alpha * Pcal design [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5702|G1605702]] - Inoue * Optimization of beam positions * To be discussed if we really need two beams * Beam monitoring (view camera) * Collaboration work with AOS * For the first step, independent system with slow (manual) taking * How to monitor the mirror edges ? and how to determine absolute position ? * GigE camera could also monitor the mirror position ? [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4237|E1504237]] * Periscope * Transmitter module * We will need a beam shutter in order to avoid exciting high frequency resonance before the Optical follower locks * Schedule * Power standard [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5704|G1605704]] - Tomaru * Inter-institute comparison is not done so often (only every ~10 years) and discrepancy of ~1% * Firstly share the same standard between LIGO and KAGRA and then investigate more on the systematics later * Discussions from theory/analysis side are needed for the impact and requirement on the absolute amplitude * Type-A simulation [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5703|G1605703]] - Miyamoto and Inoue * Suspension transfer function - SUMCOM * Cross-check between Minamoto-San and Okutomi-san * Actuator noise budget estimation - MATLAB * Time schedule - mid.Oct. * For CAL check the transfer function with the control chain * iKAGRA post-run calibration [[http://klog.icrr.u-tokyo.ac.jp/osl/index.php?r=1767|KAGRA logbook 2016/9/6]] - Yamamoto * We need to transfer back data from Kashiwa to Kamioka to put in DGS * All the necessary transfer functions should be exported from DGS to frame file for the offline calibration * Up-coming activities * Haino : 10/3 - 10/11 visit EGO/Virgo (learn commissioning and Virgo week in 10/10) * Haino : Oct.-Nov. visit Annecy to discuss about Virgo Pcal * Inoue : 10/21 - 11/10 LHO (Camera and Pcal discussion with Rick) * 2017/1/15 - 1/16 : Kajita-san comes to Taiwan for Physical Society meeting * 2017/1/15 - 1/22 : Rick comes to Taiwan for Physical Society meeting * Calibration meeting in Taiwan-Japan with Rick in this period ? * AOB * In the chief meeting on 10/11, Inoue will briefly mention about Pcal idea * CAL meeting will be held every ~1 month with dates to be determined flexibly