Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2016-11-04 02:49:01
Size: 363
Comment:
Revision 5 as of 2016-11-04 20:34:33
Size: 1291
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
  * Rick is not available this week
  * O2 will start at the end of this November
  * Yuki can probably join part of the calibration week before he leaves
Line 7: Line 10:
 * Updates in Pcal and Camera design and schedule  * Updates in Pcal and Camera design and schedule [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5796|G1605796]] - Inoue
Line 10: Line 13:
  * Calibration review in LIGO and strategy in KAGRA - Haino
  * Pcal and Camera design and schedule
  * Calibration review in LIGO and strategy in KAGRA [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5795|G1605795]] - Haino
  * Pcal and Camera design and schedule - Inoue
   * For chief meeting we better have a list of purposes for the HR Camera
   * The installation of Camera module around Apr./2017 is a good coincidence with the CRYp install test (depending on Type-A installation)
   * We should keep the schedule of outer support installation with the OpLev one in order to have the cleaning of EXA/EYA only once
   * The installation of high quality window for Pcal should be planned with the leak test schedule
Line 14: Line 21:
  * We will discuss about the high power laser and other related optics (PD, AOM) with Rick when he comes to Taiwan

CAL Meeting on 2016/11/4 15:00- (~1 hour)

Participants:

Agenda

  • Brief report from LHO - Inoue
    • Rick is not available this week
    • O2 will start at the end of this November
    • Yuki can probably join part of the calibration week before he leaves
  • Updates in Pcal and Camera design and schedule G1605796 - Inoue

  • Review of presentations in the coming chief meeting (11/7) - Inoue, Haino
    • Calibration review in LIGO and strategy in KAGRA G1605795 - Haino

    • Pcal and Camera design and schedule - Inoue
      • For chief meeting we better have a list of purposes for the HR Camera
      • The installation of Camera module around Apr./2017 is a good coincidence with the CRYp install test (depending on Type-A installation)
      • We should keep the schedule of outer support installation with the OpLev one in order to have the cleaning of EXA/EYA only once

      • The installation of high quality window for Pcal should be planned with the leak test schedule
  • AOB
    • We will discuss about the high power laser and other related optics (PD, AOM) with Rick when he comes to Taiwan

KAGRA/Subgroups/CAL/Meeting/161104 (last edited 2016-11-04 20:37:19 by SadakazuHaino)