Line 2: Line 2:
Line 21: Line 22:
 * Camera tuning EYA (2days)
 * Camera tuning EXA (2days)
 * Camera tuning IYA (2days)
 * Camera tuning IXA (2days)
Line 33: Line 38:
 * Alignment of Y-end Pcal with vaccuming (2days) -> Yuki (2018/6/14-15)  * Alignment of Y-end Pcal with vaccuming (2days) -> Yuki, (+Kimura-san) (2018/6/14-15)

Shift

Task list

  • connectiong of EYA PC to CDS (2days)
  • connectiong of EXA PC to CDS (2days)
  • connectiong of IYA PC to CDS (2days)
  • connectiong of IXA PC to CDS (2days)
  • IXA camera install(1 week)
  • Preparing the CAL-Git server (2days)
  • EXA AA/AI install (1day)
  • EYA de-whitening install (1day)
  • EXA Cabling (3days)
  • EXA Tx alignment(3days)
  • EXA Periscope alignment(3days)
  • EXA Rx alignment(1days)
  • Replacing the 2inch lenses on EYA (2days)
  • NAB EXA (1 week)
  • NAB EYA (1 week)
  • NAB IYA (1 week)
  • WSK calibration(Every month)
  • Camera tuning EYA (2days)
  • Camera tuning EXA (2days)
  • Camera tuning IYA (2days)
  • Camera tuning IXA (2days)

KEK

OCU

ICRR

  • NAB IXA (1 week)->Takaaki: On going (2018/6/11-15)

Taiwan

Academia Sinica

NCU

  • Alignment of Y-end Pcal with vaccuming (2days) -> Yuki, (+Kimura-san) (2018/6/14-15)