= Shift = * https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8405 == Task list == === Kamioka shift === * connectiong of EYA PC to CDS (2days) * connectiong of EXA PC to CDS (2days) * connectiong of IYA PC to CDS (2days)(IYA camera is not related cal work? T.Yo) * connectiong of IXA PC to CDS (2days)(IXA camera is not related cal work? T.Yo) * IXA camera install(1 week)(IXA camera is not related cal work? T.Yo) * Preparing the CAL-Git server (2days) * EX Pcal shipping(1week) * EXA AA/AI install (1day) * EYA de-whitening install (1day) * EXA Cabling (3days) * EXA Tx alignment(3days) * EXA Periscope alignment(3days) * EXA Rx alignment(1days) * Replacing the 2inch lenses on EYA (2days)(??? T.Yo) * NAB EXA (1 week)(may change to 2-3day. T.Yo) * NAB EYA (1 week)(may change to 2-3day. T.Yo) * NAB IYA (1 week)(IYA issue is not related cal work? T.Yo) * WSK calibration(Every month) * Camera tuning EYA (2days) * Camera tuning EXA (2days) * Camera tuning IYA (2days)(IYA camera is not related cal work? T.Yo) * Camera tuning IXA (2days)(IXA camera is not related cal work? T.Yo) === KEK === Member:(Tomaru), Kozakai,Bin-Hua === OCU === Member: (Kanda),Sawada,Tsuchida === ICRR === Member: Yamamoto,Yokozawa * --( NAB IXA (1 week)->Takaaki (+Akutsu-san): On going (2018/6/11-15) )-- (IXA work is not related to CAL tasks) === Taiwan === ==== Academia Sinica ==== Member: (Haino), Cory, Darkhan ==== NCU ==== Member: Inoue, Bill, Pang