   1 Sapphire Q measurement meeting
   2 
   3 2023 July 19 17:30-18:30
   4 
   5 Bajpai, Ushiba, Yamada, Tamaki, Chiba, Suzuki, Miyoki, Aso, Dan, Komori, KYamamoto
   6 
   7 
   8 Yamada : If CLIK will be used, sapphire mirror can be included.
   9 Heat swith mechanism. Heat link between mirror and frame is pushed by bar. The top of the bar is above CLIK upper flange.
  10 Heat exchange gas is useless because exchange gas can touch the vacuum chamber at room tempearature.
  11 Wire brittleness must be checked before cooling (CuBe wire is used in KAGRA cryo payload. Rahul measured 
  12 strength of some wires and results are summarized at KEK wiki).
  13 
  14 -> Conclustion : Our first priority is measurement at room temperature as soon as possible
  15 because Q of mirror at site at 250K is lower than our expectation.
  16 
  17 
  18 Radiation cooling by cooled shield : It takes time and maybe achieving tempearture is 100K ?
  19 
  20 -> Conclusion : If we have time, it is worth to try because Q around 100K could be larger than that near 300K.  
  21 
  22 
  23 Bulk Q and Q with ears (HCB) must be checked (@300K) at first .
  24 
  25 
  26 Stock check is necessary.
  27 (1)Kashiwa : Ushiba-kun will check in this week.
  28 (2)Mitaka : Aso-kun will check.
  29 
  30 
  31 For Suspension, frame, 2 loop wires, and jig to suspend are necessary. 
  32 
  33 
  34 Sensor, QPD, electrostatic actuator, Michlson interferometer, Ono sokki ?
  35 -> Michelson interferometer is the best.
  36  
  37 
  38 Komori-kun and Rishabh-kun can assist Yamada-kun.
  39 
  40 Schedule : 6 months for room temperature measurement as first plan (if necessary we will change)
  41 (1)Design by end of August 
  42 (2)Procurement : 3 months
  43 (3)Measurement 
  44  
  45 In next 2 weeks, Yamada-kun and Suzuki-san prepare disign and we discuss. 
  46 
  47 
  48 A/I
  49 Yamada and Suzuki : Design of experimental apparatus
  50 Ushiba and Aso : Sapphire mirror stock checks at Kashiwa and Mitaka
  51 KYamamoto : Evaluation of Q by residual gas damping
  52 
  53 
  54 Next meeting will be on 3rd(Thu) or 4th(Fri) of August. KYamomamot circulates doodle later.
  55 
  56 
  57 Memo about details
  58 
  59 Thickness 
  60 HCB lambda/4 = 150 nm 
  61 Galium several tens micro m
  62 Sumicearm 0.1 mm 
  63   
  64 Schedule for new ITM's : Polish until March 2025. -> 6 month for coating 
  65 
  66 
  67  

Attached Files

To refer to attachments on a page, use attachment:filename, as shown below in the list of files. Do NOT use the URL of the [get] link, since this is subject to change and can break easily.
  • [get | view] (2023-11-16 18:18:42, 3246.5 KB) [[attachment:2023.11.15-Q measurement meeting.pdf]]
  • [get | view] (2023-08-24 18:37:42, 4826.4 KB) [[attachment:230803_MIRQ_tyamada.pdf]]
  • [get | view] (2023-08-24 18:37:49, 2791.9 KB) [[attachment:230824_MIRQ_tyamada.pdf]]
  • [get | view] (2023-09-21 19:08:38, 1585.3 KB) [[attachment:230921_MIRQ_tyamada.pdf]]
  • [get | view] (2023-10-10 23:10:20, 36.8 KB) [[attachment:231010_MIRQ_tyamada.pdf]]
  • [get | view] (2023-09-22 00:17:54, 2611.3 KB) [[attachment:Fiber Q.pdf]]
  • [get | view] (2023-11-15 16:48:56, 1.9 KB) [[attachment:Sapphire Q measureme 20231115.txt]]
  • [get | view] (2023-08-24 16:26:09, 2.1 KB) [[attachment:Sapphire Q measurement 20230719.txt]]
  • [get | view] (2023-08-24 16:38:25, 2.6 KB) [[attachment:Sapphire Q measurement 20230803.txt]]
  • [get | view] (2023-08-24 17:35:15, 3.2 KB) [[attachment:Sapphire Q measurement 20230824 revised.txt]]
  • [get | view] (2023-08-24 17:04:23, 7.9 KB) [[attachment:Sapphire Q measurement 20230824.txt]]
  • [get | view] (2023-09-21 19:07:56, 3.0 KB) [[attachment:Sapphire Q measurement 20230921.txt]]
  • [get | view] (2023-10-10 23:12:02, 3.2 KB) [[attachment:Sapphire Q measurement 20231010.txt]]
  • [get | view] (2023-11-15 16:49:57, 1.9 KB) [[attachment:Sapphire Q measurement 20231115.txt]]
  • [get | view] (2023-08-24 15:50:17, 5.9 KB) [[attachment:sapphire mirror Q 20230707.txt]]
  • [get | view] (2023-08-24 16:08:49, 4.2 KB) [[attachment:sapphire mirror Q 20230712.txt]]
 All files | Selected Files: delete move to page copy to page

You are not allowed to attach a file to this page.