Attachment 'Sapphire Q measurement 20230824 revised.txt'

Download

   1 Sapphire Q measurement meeting
   2 
   3 2023 August 24 13:00-14:00
   4 
   5 Aso, Dan, KYamamoto, RTakahashi, Aso, Suzuki, Miyoki 
   6 
   7 (1)Stocks of bulks with ears
   8 Two pieces were found at NAOJ. Marc would like to measure both of them. We expect that he will measure at least 
   9 one of them before we prepare our apparatus.
  10 
  11 (2)Offsite Q measurement
  12 Yesterday and today, M. Yamamoto and Y. Sato (U Toyama), K. Komori (U Tokyo), K. Tanaka (ICRR) are measuring Q of 
  13 ETMX (about 30K). We are afraid that AR side is covered by frost.
  14 
  15 (4)Suzuki-san's  suggestion
  16 (1)Short meeting (1 hour) -> At least this meeting ended within one hour. 
  17 (2)We also take care of Q of sapphire fibers in this meeting (later).
  18 
  19 
  20 (4)Mirror Q measurement (Yamada and Suzuki)
  21 
  22 (a)Clamp : Wire inclination is 10 degree to avoid any bending of wire.
  23 
  24 (b)Wire breakers
  25 Other wire breakers, for example breakers on bottom side or smaller breaker on 
  26 lower side -> RTakahashi pointed out smaller breakers were broken or dropped if he 
  27 remember correclty.
  28 A/I : Yamada asks Hirata-san details later.
  29 
  30 Long breakers (2 pieces) or short breakers (4 pieces) ? 
  31 -> Shorter ones to avoid effect on Q.
  32  
  33 Distance between wires : According to N. Ohishi's master thesis (https://granite.phys.s.u-tokyo.ac.jp/theses/Ohishi-m.pdf),
  34 the best distance between 2 loop wires for Q measurement is one third of mirror thicknes.
  35 It implies that wires must be in slits of sapphire ears. However, the wire breaker 
  36 could be larger (and Q might be lower).
  37 A/I : Yamada and Suzuki check the size of breakers for wires in slits. 
  38 
  39 Material wire breaker is stainless. Sapphire breaker lead time is long.
  40 
  41 (c)Glue
  42 Glue must be removed. What kinds of glue ? Are In or Ga feasible (this glue need 
  43 not to support heavy load) (Dan's suggestions) ? -> We continue discussion.
  44 
  45 (d)Earthquake stopper and Actuator
  46 Yamada and Suzuki's idea is similar to HCB box. In HCB box, soft large parts touch HR
  47 and screw touch AR to fix the mirror. In Q measurement, actuator electrode 
  48 is on AR surface.To avoid collision of AR surface and electrode, soft large part is 
  49 necessary on AR side. So, screw is on HR side. Is it OK ? Otherwise, screw touch on 
  50 chamfer ?
  51 -> D. Chen suggests the electrode on HR side which has hole for laser beam. 
  52 Large soft part is on HR side and screw is on AR side as HCB box. -> We approve.
  53 A/I : Yamada and Suzuki revise Earthquake stopper.
  54 
  55 Again, according to N. Ohishi's master thesis, she used two metal plate (not 
  56 comb like !) as electrode of actuator. Laser beam is in gap between two metal plates.
  57 Actullay it makes sense because the 
  58 bulk is large. The torelance of gap between electrode and bulk is modest.
  59 -> Yamada and Suzuki consider details of actuator.
  60 
  61 (e)Installation 
  62 Misumi frame, lab jack (it can work with heavy load), and roters (they can work with
  63 heavy load).
  64 
  65 (5)Budget : Miyoki requests quoation for discussion.
  66 
  67 Next meeting will be on the week of 18th of September. Kazuhiro will circulate doodle later.
  68 
  69 A/I (all for Yamada and Suzuki)
  70 (a)Asking Hirata-san details of wire breakers in Type B and Bp as reference later.
  71 (b)Checking the size of breakers for wires in slits. 
  72 (c)Revising or consideration about design of actuator and earthquake stopper.
  73 (d)Quotation

Attached Files

To refer to attachments on a page, use attachment:filename, as shown below in the list of files. Do NOT use the URL of the [get] link, since this is subject to change and can break easily.
  • [get | view] (2023-11-16 18:18:42, 3246.5 KB) [[attachment:2023.11.15-Q measurement meeting.pdf]]
  • [get | view] (2023-08-24 18:37:42, 4826.4 KB) [[attachment:230803_MIRQ_tyamada.pdf]]
  • [get | view] (2023-08-24 18:37:49, 2791.9 KB) [[attachment:230824_MIRQ_tyamada.pdf]]
  • [get | view] (2023-09-21 19:08:38, 1585.3 KB) [[attachment:230921_MIRQ_tyamada.pdf]]
  • [get | view] (2023-10-10 23:10:20, 36.8 KB) [[attachment:231010_MIRQ_tyamada.pdf]]
  • [get | view] (2023-09-22 00:17:54, 2611.3 KB) [[attachment:Fiber Q.pdf]]
  • [get | view] (2023-11-15 16:48:56, 1.9 KB) [[attachment:Sapphire Q measureme 20231115.txt]]
  • [get | view] (2023-08-24 16:26:09, 2.1 KB) [[attachment:Sapphire Q measurement 20230719.txt]]
  • [get | view] (2023-08-24 16:38:25, 2.6 KB) [[attachment:Sapphire Q measurement 20230803.txt]]
  • [get | view] (2023-08-24 17:35:15, 3.2 KB) [[attachment:Sapphire Q measurement 20230824 revised.txt]]
  • [get | view] (2023-08-24 17:04:23, 7.9 KB) [[attachment:Sapphire Q measurement 20230824.txt]]
  • [get | view] (2023-09-21 19:07:56, 3.0 KB) [[attachment:Sapphire Q measurement 20230921.txt]]
  • [get | view] (2023-10-10 23:12:02, 3.2 KB) [[attachment:Sapphire Q measurement 20231010.txt]]
  • [get | view] (2023-11-15 16:49:57, 1.9 KB) [[attachment:Sapphire Q measurement 20231115.txt]]
  • [get | view] (2023-08-24 15:50:17, 5.9 KB) [[attachment:sapphire mirror Q 20230707.txt]]
  • [get | view] (2023-08-24 16:08:49, 4.2 KB) [[attachment:sapphire mirror Q 20230712.txt]]
 All files | Selected Files: delete move to page copy to page

You are not allowed to attach a file to this page.