   1 Sapphire Q measurement meeting
   2 
   3 2023 September 21st (Thu) 16:30-18:00
   4 
   5 TYamada, R. Bajpai, Aso, KYamamoto, RTakahashi, Aso, Suzuki, Komori 
   6 
   7 (1)Offsite Q measurement
   8 Q-value measurement of ITMY under 88K by M. Yamamoto (Toyama), Nakano (Caltech), K.Tanaka (ICRR).
   9 It was on the order of 10^6 !
  10 (at 250K, on the order of 10^4. ETMX Q around 80K was on the order of 10^5).
  11 https://klog.icrr.u-tokyo.ac.jp/osl/?r=26679
  12 
  13 
  14 (2)Mirror Q measurement (Yamada and Suzuki)
  15 
  16 (a)Improvement of EQS ->Large teflon parts push HR and screws with teflon push AR screw as HCB box.
  17 50mm hole for laser beam.
  18  
  19 (b)Electrode design
  20 4 simple electrodes.
  21 
  22 (c)Gluing system
  23 We reuse HCB box and some parts fabrication is necessary.
  24 We use optical table. M6 screw holes (25mm inteval) are position reference. The pin in these holes contact 
  25 HCB box and the box position is decided.
  26 
  27 The designs of the parts to handle breakers themselves are being considered. Only x-stage is necessary to 
  28 push breakers on mirror barrel surface because the position of the stage is decided precisely (M6 holes). 
  29 A/I : Yamada asks Hirata-san details of breakres later. 
  30 
  31 Sapphire spare mirror and HCB box can be outside clean booth ?
  32 -> Spare mirror is OK. But we are not sure HCB box. 
  33 -> A/I Kazuhiro asks Ushiba-kun HCB box stocks and which can be used. 
  34 
  35 (d)Ear's slit
  36 
  37 Two choises
  38 (i)We do not use ear's slit (wires is near AR or HR). Squeezed (not vertical) wires. Two breakers for each wire.
  39 (ii)We use ear's slit. Wires are almost along vertical direction. Four breakers are necessary for each wire. Revision 
  40 of clamp part is necessary.
  41 -> We selected (ii). 
  42 
  43 (e) Quotation is sent by 6th October (Fri)
  44 
  45 (f)Glue
  46 Discussion is in progress. EP-30 in Type B and Bp.
  47 
  48 What we discussed in the previous meeting. 
  49 Glue must be removed. What kinds of glue ? Are In or Ga feasible (this glue need 
  50 not to support heavy load) (Dan's suggestions) ? -> We continue discussion.
  51 
  52 
  53 
  54 (3)Sapphire fiber Q measurement (Bajpai)
  55 
  56 Support : 2 Cu plates, double suspension, heatlink between 2 Cu plated. 
  57 Short and long fibers can be measured.
  58 If vibration is large, damper (magnets) is installed.
  59 Corn shape clamp is used even for square nail heads.
  60  
  61 Misumi Al frame could be deformed. Stainless could be adopted because we do not expect frame as 
  62 heat transfer. 
  63 This frame is on optical table connected to cold head.
  64 
  65 Laser displacement sensor is used. 
  66 
  67 Electrode must be designed. 
  68 Many electrodes are useful when we want to excite many modes. 
  69 High voltage supply in KEK must be checked (specification and whether they work).
  70 
  71 Thermometer calibration cooling (thermometer on bottom side of fiber) is planned.
  72 Details of heater must be taken care of.
  73 
  74 Chen's thesis is a reference.
  75 
  76 Budget : Not so many ?
  77 
  78 Next meeting will be on the week of 9th of October. Kazuhiro will circulate doodle later.
  79 
  80 A/I
  81 (a)Yamada asks Hirata-san details of breakres later. (wire breakers in Type B and Bp as reference later).
  82 (b)Kazuhiro asks Ushiba-kun HCB box stocks and which can be used.

Attached Files

To refer to attachments on a page, use attachment:filename, as shown below in the list of files. Do NOT use the URL of the [get] link, since this is subject to change and can break easily.
  • [get | view] (2023-11-16 18:18:42, 3246.5 KB) [[attachment:2023.11.15-Q measurement meeting.pdf]]
  • [get | view] (2023-08-24 18:37:42, 4826.4 KB) [[attachment:230803_MIRQ_tyamada.pdf]]
  • [get | view] (2023-08-24 18:37:49, 2791.9 KB) [[attachment:230824_MIRQ_tyamada.pdf]]
  • [get | view] (2023-09-21 19:08:38, 1585.3 KB) [[attachment:230921_MIRQ_tyamada.pdf]]
  • [get | view] (2023-10-10 23:10:20, 36.8 KB) [[attachment:231010_MIRQ_tyamada.pdf]]
  • [get | view] (2023-09-22 00:17:54, 2611.3 KB) [[attachment:Fiber Q.pdf]]
  • [get | view] (2023-11-15 16:48:56, 1.9 KB) [[attachment:Sapphire Q measureme 20231115.txt]]
  • [get | view] (2023-08-24 16:26:09, 2.1 KB) [[attachment:Sapphire Q measurement 20230719.txt]]
  • [get | view] (2023-08-24 16:38:25, 2.6 KB) [[attachment:Sapphire Q measurement 20230803.txt]]
  • [get | view] (2023-08-24 17:35:15, 3.2 KB) [[attachment:Sapphire Q measurement 20230824 revised.txt]]
  • [get | view] (2023-08-24 17:04:23, 7.9 KB) [[attachment:Sapphire Q measurement 20230824.txt]]
  • [get | view] (2023-09-21 19:07:56, 3.0 KB) [[attachment:Sapphire Q measurement 20230921.txt]]
  • [get | view] (2023-10-10 23:12:02, 3.2 KB) [[attachment:Sapphire Q measurement 20231010.txt]]
  • [get | view] (2023-11-15 16:49:57, 1.9 KB) [[attachment:Sapphire Q measurement 20231115.txt]]
  • [get | view] (2023-08-24 15:50:17, 5.9 KB) [[attachment:sapphire mirror Q 20230707.txt]]
  • [get | view] (2023-08-24 16:08:49, 4.2 KB) [[attachment:sapphire mirror Q 20230712.txt]]
 All files | Selected Files: delete move to page copy to page

You are not allowed to attach a file to this page.