   1 Sapphire Q measurement meeting
   2  
   3 2023 November 15th (Wed) 13:00-14:00
   4 
   5 Yamada, Bajpai, Tomaru, RTakahashi, Miyoki, Suzuki, Komori
   6 
   7 (1)Offsite Mirror Q measurement (Yamada and Suzuki)
   8 
   9 Yamada-kun showed a quotation. Some parts are asked to KEK machine shop. Almost all parts are ordered to a company.
  10 He also showed cost for optical components, frame, and for contingency.
  11 Miyoki-san approves and Yamada-kun starts to procure.
  12 
  13 The lead time is 1.5 month. So, delivery will be on beginning of January.
  14 Suzuki-san and Rishabh-kun support to assemble.
  15 
  16 
  17 Discussion
  18 (a)When, how, who transports "spare" mirror from NAOJ and KEK ?
  19 -> Kazuhiro asks Aso-kun.
  20 
  21 (b)For cryogenic experiment, tungsten wire brittleness must be checked. 
  22 -> Apparatus is in KEK. Yamada-kun asks Suzuki-san.
  23 
  24 (c)Stainless dummy mirror (whose size and weight are same as those of KAGRA sapphire mirror).
  25 -> This dummy and transportation case for it are at Toyama. Kazuhiro sends later.
  26 
  27 (d)What kinds of glue we use is still open question. 
  28 Small out gas, for cryogenic experiment, it can be removed (EP30 can not be removed).
  29 Silicon base ? Epoxiy can be removed with acid.
  30 -> Yamada-kun and Suzuki-san discuss.
  31 
  32 
  33 (2)Offsite fiber Q measurement (Bajpai)
  34 
  35 Shield and flange deformation were found (2-5mm) and are being repaired.
  36 
  37 Fiber Q measurement apparatus
  38 (a)Cu parts be delivered before Christmas.
  39 (b)Misumi Al frame is adopted. -> Not so much cost.
  40 (c)Fiber samples at Kashiwa and Tsukuba will be measured at first.
  41 
  42 Bonding Q measurement
  43 (a)Two sapphire disks are bonded and its Q will be measured. -> Kazuhiro send sapphire disks later.
  44 (b)Electrode actuator - > Kazuhiro tells Rishabh-kun later.
  45 (c)Bonding -> Rishabh-kun requsts ideas about what kinds of bondign.
  46 
  47 Next meeting : No meeting unless somebodies request.
  48 Kazuhiro ask Yamada-kun and Rishabh-kun whether we need to open meeting on the beginning of 2024.

Attached Files

To refer to attachments on a page, use attachment:filename, as shown below in the list of files. Do NOT use the URL of the [get] link, since this is subject to change and can break easily.
  • [get | view] (2023-11-16 18:18:42, 3246.5 KB) [[attachment:2023.11.15-Q measurement meeting.pdf]]
  • [get | view] (2023-08-24 18:37:42, 4826.4 KB) [[attachment:230803_MIRQ_tyamada.pdf]]
  • [get | view] (2023-08-24 18:37:49, 2791.9 KB) [[attachment:230824_MIRQ_tyamada.pdf]]
  • [get | view] (2023-09-21 19:08:38, 1585.3 KB) [[attachment:230921_MIRQ_tyamada.pdf]]
  • [get | view] (2023-10-10 23:10:20, 36.8 KB) [[attachment:231010_MIRQ_tyamada.pdf]]
  • [get | view] (2023-09-22 00:17:54, 2611.3 KB) [[attachment:Fiber Q.pdf]]
  • [get | view] (2023-11-15 16:48:56, 1.9 KB) [[attachment:Sapphire Q measureme 20231115.txt]]
  • [get | view] (2023-08-24 16:26:09, 2.1 KB) [[attachment:Sapphire Q measurement 20230719.txt]]
  • [get | view] (2023-08-24 16:38:25, 2.6 KB) [[attachment:Sapphire Q measurement 20230803.txt]]
  • [get | view] (2023-08-24 17:35:15, 3.2 KB) [[attachment:Sapphire Q measurement 20230824 revised.txt]]
  • [get | view] (2023-08-24 17:04:23, 7.9 KB) [[attachment:Sapphire Q measurement 20230824.txt]]
  • [get | view] (2023-09-21 19:07:56, 3.0 KB) [[attachment:Sapphire Q measurement 20230921.txt]]
  • [get | view] (2023-10-10 23:12:02, 3.2 KB) [[attachment:Sapphire Q measurement 20231010.txt]]
  • [get | view] (2023-11-15 16:49:57, 1.9 KB) [[attachment:Sapphire Q measurement 20231115.txt]]
  • [get | view] (2023-08-24 15:50:17, 5.9 KB) [[attachment:sapphire mirror Q 20230707.txt]]
  • [get | view] (2023-08-24 16:08:49, 4.2 KB) [[attachment:sapphire mirror Q 20230712.txt]]
 All files | Selected Files: delete move to page copy to page

You are not allowed to attach a file to this page.