Differences between revisions 2 and 64 (spanning 62 versions)
Revision 2 as of 2013-11-27 21:12:43
Size: 13142
Comment:
Revision 64 as of 2014-04-07 11:29:15
Size: 21287
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
= Cryogenic integration and payload meetings =
'''[[KAGRA/Subgroups/CRY| back to CRY top]]'''
Line 4: Line 6:
= Cryopayload's Action Item List =
'''[[KAGRA/Subgroups/CRY| back to CRY top]]'''
Line 8: Line 7:
Here are slides and minute for Cryogenic payload meeting. Here are slides and minute for Cryogenic integration and payload meetings.
Line 12: Line 11:
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2106|Preliminary design of Type-A suspension system (cryogenic seismic attenuation system) for KAGRA sapphire mirrors(T. Sekiguchi, E. Hirose)]]
Line 13: Line 13:
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2076|Components in KAGRA radiation shield(S. Koike)]]
 . ・ [[https://www.icrr.u-tokyo.ac.jp/~miyoki/KAGRA-CleanBooth.zip|CAD drawing for clean booth(Shinji Miyoki)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2188|Wide-angle baffle(prototype)(T. Akutsu)]]
Line 20: Line 23:
  * [[KAGRA/Subgroups/CRY/cryopayload_AIs|Action Item List]]
  * [[KAGRA/Subgroups/CRY/ryopayload_AIs|Action Item List]]

----

=== Cryogenic integration and payload meetings (2014 Apr. 7th ICRR) ===

 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=|Minutes(K. Yamamoto)]]

=== Cryogenic integration and payload meetings (2014 Mar. 18th ICRR) ===

 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2260|Sapphire Monolithic Suspension Strategy (D. Chen)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2267|Minutes(K. Yamamoto)]]

=== Cryogenic integration and payload meetings (2014 Mar. 11th ICRR) ===

 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2266|Minutes(K. Yamamoto)]]

=== Cryogenic integration and payload meetings (2014 Mar. 4th ICRR) ===

 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2242|Simulation for the load on the floor of radiation shield and design of cryo duct on the ceiling of radiation shield(T. Tomaru)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2260|Monolithic suspension(D. Chen)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2243|Minutes(K. Yamamoto)]]


=== Cryogenic integration and payload meetings (2014 Feb. 25th ICRR) ===

 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2233|Payload installation layout and Discussion(T. Tomaru)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2234|Minutes(K. Yamamoto)]]

=== Cryogenic payload meeting (2014 Feb. 18th ICRR) ===

 . ・ [[https://www.icrr.u-tokyo.ac.jp/~miyoki/KAGRA-CleanBooth.zip|CAD drawing for clean booth(Shinji Miyoki)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2222|Vibration via heat links(Dan Chen)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2226|Minutes(K. Yamamoto)]]

=== Cryogenic payload meeting (2014 Feb. 4th ICRR) ===

 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2180|Latest version of A/I list of AOS-MIR-CRy meeting with K. Yamamoto's comments]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2181|Indium(A. Khalaidovski)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2182|Minutes(K. Yamamoto)]]

=== Cryogenic payload meeting (2014 Jan. 28th ICRR) ===

 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2158|Slides for cryogenic payload meeting (2014.1.28)(strategies of cryo payload and indium welding)(T. Tomaru)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2177|Cryogenic payload design - 2 (Cradle sapphire suspension)(R. Kumar)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2157|Control(D. Chen)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2176|Minutes(K. Yamamoto)]]

=== Cryogenic payload meeting (2014 Jan. 21st ICRR) ===
 . ・ [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/Meet/Agenda20140121|10Hz- 30Hz sensitivity(Detchar meeting)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2143|"Backup" plan(K. Yamamoto)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2147|Control(D. Chen)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2149|Minutes(K. Yamamoto)]]

=== Cryogenic payload meeting (2014 Jan. 14th ICRR) ===
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2134|Control(D. Chen)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2135|Thermal conductivity measurement of heat links(Y. Sakakibara)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2139|Minutes(K. Yamamoto)]]


=== Cryogenic payload meeting (2014 Jan. 7th ICRR) ===
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2106|Preliminary design of Type-A suspension system (cryogenic seismic attenuation system) for KAGRA sapphire mirrors(T. Sekiguchi, E. Hirose)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2107|Control(D. Chen)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2109|サファイアHCB 再接合強度(T. Suzuki)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2110|Minutes(K. Yamamoto)]]

=== Cryogenic payload meeting (2013 Dec. 24th ICRR) ===
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2092|Noise (vibration via heat link, thermal noise) of cryo payload(T. Uchiyama, K. Yamamoto)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2071|10-20Hzの影響について(K. Hayama)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2095|Control(D. Chen)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2103|エポキシ樹脂からの脱ガス Outgas from Epoxy resin(T. Suzuki)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2103|Minutes(K. Yamamoto)]]

=== Cryogenic payload meeting (2013 Dec. 17th ICRR) ===
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2072|Simulation with control system(T. Sekiguchi)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2073|Sapphire blade spring (R. Kumar)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2063|Control(D. Chen)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2071|10-20Hzの影響について(K. Hayama)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2074|Calculation of thermal radiation from SAS hole(Y. Sakakibara)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2075|Friction Coefficient of Sapphire Surface(T. Suzuki)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2076|Components in KAGRA radiation shield(S. Koike)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2077|AdhesiveTest(T. Suzuki)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2091|Minutes(K. Yamamoto)]]

=== Cryogenic payload meeting (2013 Dec. 10th ICRR) ===
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2060|Control(D. Chen)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2069|Minutes(K. Yamamoto)]]

=== Cryogenic payload meeting (2013 Dec. 3rd ICRR) ===
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2029|Strategies for sapphire monolithic suspension 2(K. Yamamoto)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2026|Vibration via heat link (T. Sekiguchi)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2031|Control(D. Chen)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2052|Minutes(K. Yamamoto)]]
Line 166: Line 260:


'''[[KAGRA/Subgroups/CRY| back to CRY top]]'''

Cryogenic integration and payload meetings

back to CRY top

Contents

  1. Cryogenic integration and payload meetings
    1. General Descriptions
      1. Design drawings
      2. Schedule about cryogenic payload
      3. Action Items list
      4. Cryogenic integration and payload meetings (2014 Apr. 7th ICRR)
      5. Cryogenic integration and payload meetings (2014 Mar. 18th ICRR)
      6. Cryogenic integration and payload meetings (2014 Mar. 11th ICRR)
      7. Cryogenic integration and payload meetings (2014 Mar. 4th ICRR)
      8. Cryogenic integration and payload meetings (2014 Feb. 25th ICRR)
      9. Cryogenic payload meeting (2014 Feb. 18th ICRR)
      10. Cryogenic payload meeting (2014 Feb. 4th ICRR)
      11. Cryogenic payload meeting (2014 Jan. 28th ICRR)
      12. Cryogenic payload meeting (2014 Jan. 21st ICRR)
      13. Cryogenic payload meeting (2014 Jan. 14th ICRR)
      14. Cryogenic payload meeting (2014 Jan. 7th ICRR)
      15. Cryogenic payload meeting (2013 Dec. 24th ICRR)
      16. Cryogenic payload meeting (2013 Dec. 17th ICRR)
      17. Cryogenic payload meeting (2013 Dec. 10th ICRR)
      18. Cryogenic payload meeting (2013 Dec. 3rd ICRR)
      19. Cryogenic payload meeting (2013 Nov. 26th ICRR)
      20. Cryogenic payload meeting (2013 Nov. 19th ICRR)
      21. Cryogenic payload kickoff meeting (2013 Nov. 15th ICRR)
      22. 20th cryogenic payload meeting (2013 Feb. 6 ICRR)
      23. 19th cryogenic payload meeting (2013 Jan. 9 ICRR)
      24. 18th cryogenic payload meeting (2012 Dec. 12 ICRR)
      25. 17th cryogenic payload meeting (2012 Nov. 4 ICRR)
      26. 16th cryogenic payload meeting (2012 Sep. 26 ICRR)
      27. 15th cryogenic payload meeting (2012 Aug. 29 ICRR)
      28. 14th cryogenic payload meeting (2012 Aug. 8 ICRR)
      29. 13th cryogenic payload meeting (2012 July. 4 ICRR)
      30. 12th cryogenic payload meeting (2012 June. 6 ICRR)
      31. 11th cryogenic payload meeting (2012 April. 25 ICRR)
      32. 10th cryogenic payload meeting (2012 April. 4 ICRR)
      33. 9th cryogenic payload meeting (2012 Mar. 7 ICRR)
      34. 8th cryogenic payload meeting (2012 Feb. 8 ICRR)
      35. 第七回 低温懸架打ち合わせ(2012.1.10 ICRR)
      36. 第六回 低温懸架打ち合わせ(2011.11.30 ICRR)
      37. 第五回 低温懸架打ち合わせ(2011.10.26 ICRR)
      38. 第四回 低温懸架打ち合わせ(2011.09.28 ICRR)
      39. 第三回 低温懸架打ち合わせ(2011.08.31 ICRR)
      40. 第一回 低温懸架打ち合わせ(2011.07.01 KEK)
      41. 低温装置打ち合わせ

General Descriptions

Here are slides and minute for Cryogenic integration and payload meetings.

Design drawings

Schedule about cryogenic payload

Action Items list


Cryogenic integration and payload meetings (2014 Apr. 7th ICRR)

Cryogenic integration and payload meetings (2014 Mar. 18th ICRR)

Cryogenic integration and payload meetings (2014 Mar. 11th ICRR)

Cryogenic integration and payload meetings (2014 Mar. 4th ICRR)

Cryogenic integration and payload meetings (2014 Feb. 25th ICRR)

Cryogenic payload meeting (2014 Feb. 18th ICRR)

Cryogenic payload meeting (2014 Feb. 4th ICRR)

Cryogenic payload meeting (2014 Jan. 28th ICRR)

Cryogenic payload meeting (2014 Jan. 21st ICRR)

Cryogenic payload meeting (2014 Jan. 14th ICRR)

Cryogenic payload meeting (2014 Jan. 7th ICRR)

Cryogenic payload meeting (2013 Dec. 24th ICRR)

Cryogenic payload meeting (2013 Dec. 17th ICRR)

Cryogenic payload meeting (2013 Dec. 10th ICRR)

Cryogenic payload meeting (2013 Dec. 3rd ICRR)

Cryogenic payload meeting (2013 Nov. 26th ICRR)

Cryogenic payload meeting (2013 Nov. 19th ICRR)

Cryogenic payload kickoff meeting (2013 Nov. 15th ICRR)

20th cryogenic payload meeting (2013 Feb. 6 ICRR)

19th cryogenic payload meeting (2013 Jan. 9 ICRR)

18th cryogenic payload meeting (2012 Dec. 12 ICRR)

17th cryogenic payload meeting (2012 Nov. 4 ICRR)

16th cryogenic payload meeting (2012 Sep. 26 ICRR)

15th cryogenic payload meeting (2012 Aug. 29 ICRR)

14th cryogenic payload meeting (2012 Aug. 8 ICRR)

13th cryogenic payload meeting (2012 July. 4 ICRR)

12th cryogenic payload meeting (2012 June. 6 ICRR)

11th cryogenic payload meeting (2012 April. 25 ICRR)

10th cryogenic payload meeting (2012 April. 4 ICRR)

9th cryogenic payload meeting (2012 Mar. 7 ICRR)

8th cryogenic payload meeting (2012 Feb. 8 ICRR)

第七回 低温懸架打ち合わせ(2012.1.10 ICRR)

第六回 低温懸架打ち合わせ(2011.11.30 ICRR)

第五回 低温懸架打ち合わせ(2011.10.26 ICRR)

第四回 低温懸架打ち合わせ(2011.09.28 ICRR)

第三回 低温懸架打ち合わせ(2011.08.31 ICRR)

第一回 低温懸架打ち合わせ(2011.07.01 KEK)

低温装置打ち合わせ

.Report of annealing for thin Al bundles 2011.06.24 .・ Heat Linkサンプルの焼鈍結果 110627

.Cryostat Shield (4th) 2011.2.24 and Cryostat Shield (4th) 2011.2.25, KEK Cryogenics Centre R110

.Cryostat Shield (4th) 2011.2.14 KEK Cryogenics Centre R110

.Cryostat Shield (3rd) 2011.2.10 KEK Cryogenics Centre R110 Polycom+EVO

.Cryostat 2010.11.18 EVO

back to CRY top

KAGRA/Subgroups/CRY/CRYpmeeting (last edited 2020-04-22 21:17:34 by KazuhiroYamamoto)