Differences between revisions 413 and 414
Revision 413 as of 2018-07-02 20:46:07
Size: 56236
Comment:
Revision 414 as of 2018-07-10 16:43:51
Size: 56405
Comment:
Deletions are marked like this. Additions are marked like this.
Line 27: Line 27:

=== Cryogenic payload meetings (2018 July 10th KEK) ===

 . ・[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=|Minutes(K. Yamamoto)]]

Cryogenic integration and payload meetings

back to CRY top

Contents

  1. Cryogenic integration and payload meetings
    1. General Descriptions
      1. Design drawings
      2. Schedule about cryogenic payload
      3. Action Items list
      4. Cryogenic payload meetings (2018 July 10th KEK)
      5. Cryogenic payload meetings (2018 July 3rd KEK)
      6. Cryogenic payload meetings (2018 June 26th KEK)
      7. Cryogenic payload meetings (2018 June 19th KEK)
      8. Cryogenic payload meetings (2018 June 12th KEK)
      9. Cryogenic payload meetings (2018 June 5th KEK)
      10. Cryogenic payload meetings (2018 May 29th KEK)
      11. Cryogenic payload meetings (2018 May 22nd KEK)
      12. Cryogenic payload meetings (2018 May 15th KEK)
      13. Cryogenic payload meetings (2018 May 10th KEK)
      14. Cryogenic payload meetings (2018 May 2nd KEK)
      15. Cryogenic payload meetings (2018 April 24th KEK)
      16. Cryogenic payload meetings (2018 April 17th KEK)
      17. Cryogenic payload meetings (2018 April 10th KEK)
      18. Cryogenic payload meetings (2018 April 4th KEK)
      19. Cryogenic payload meetings (2018 March 27th KEK)
      20. Cryogenic payload meetings (2018 March 20th KEK)
      21. Cryogenic payload meetings (2018 March 13th KEK)
      22. Cryogenic payload meetings (2018 March 6th KEK)
      23. Cryogenic payload meetings (2018 February 27th KEK)
      24. Cryogenic payload meetings (2018 February 20th KEK)
      25. Cryogenic payload meetings (2018 February 13th KEK)
      26. Cryogenic payload meetings (2018 February 7th KEK)
      27. Cryogenic payload meetings (2018 January 30th KEK)
      28. Cryogenic payload meetings (2018 January 23rd KEK)
      29. Cryogenic payload meetings (2018 January 16th KEK)
      30. Cryogenic payload meetings (2018 January 9th KEK)
      31. Cryogenic payload meetings (2017 December 26th KEK)
      32. Cryogenic payload meetings (2017 December 19th KEK)
      33. Cryogenic payload meetings (2017 December 12th KEK)
      34. Cryogenic payload meetings (2017 December 5th TiTech)
      35. Cryogenic payload meetings (2017 November 28th KEK)
      36. Cryogenic payload meetings (2017 November 21st KEK)
      37. Cryogenic payload meetings (2017 November 14th KEK)
      38. Cryogenic payload meetings (2017 November 7th KEK)
      39. Cryogenic payload meetings (2017 October 31st KEK)
      40. Cryogenic payload meetings (2017 October 25th KEK)
      41. Cryogenic payload meetings (2017 October 17th KEK)
      42. Cryogenic payload meetings (2017 October 10th KEK)
      43. Cryogenic payload meetings (2017 October 3rd KEK)
      44. Cryogenic payload meetings (2017 September 26th KEK)
      45. Cryogenic payload meetings (2017 September 19th KEK)
      46. Cryogenic payload meetings (2017 September 5th KEK)
      47. Cryogenic payload short meetings (2017 August 29th Toyama)
      48. Cryogenic payload meetings (2017 August 22nd KEK)
      49. Cryogenic payload meetings (2017 August 8th KEK)
      50. Cryogenic payload meetings (2017 July 28th KEK)
      51. Cryogenic payload meetings (2017 July 21st KEK)
      52. Cryogenic payload meetings (2017 July 14th KEK)
      53. Cryogenic payload meetings (2017 June 30th KEK)
      54. Cryogenic payload meetings (2017 June 23rd KEK)
      55. Cryogenic payload meetings (2017 June 16th KEK)
      56. Cryogenic payload meetings (2017 June 8th KEK)
      57. Cryogenic payload meetings (2017 June 1st KEK)
      58. Cryogenic payload meetings (2017 May 26th KEK)
      59. Cryogenic payload meetings (2017 May 9th KEK)
      60. Cryogenic payload meetings (2017 April 25th KEK)
      61. Cryogenic payload meetings (2017 April 18th KEK)
      62. Cryogenic payload meetings (2017 April 11th KEK)
      63. Cryogenic payload meetings (2017 April 4th KEK)
      64. Cryogenic payload meetings (2017 March 21st KEK)
      65. Cryogenic payload meetings (2017 March 14th KEK)
      66. Cryogenic payload meetings (2017 March 7th KEK)
      67. Cryogenic payload meetings (2017 February 28th KEK)
      68. Cryogenic payload meetings (2017 February 21st KEK)
      69. Cryogenic payload meetings (2017 February 14th KEK)
      70. Cryogenic payload meetings (2017 February 7th KEK)
      71. Cryogenic payload meetings (2017 January 31st ICRR)
      72. Cryogenic payload meetings (2017 January 24th KEK)
      73. Cryogenic payload meetings (2017 January 17th KEK)
      74. Cryogenic payload meetings (2017 January 11th KEK)
      75. Cryogenic payload meetings (2016 December 21st KEK)
      76. Cryogenic payload meetings (2016 November 29nd KEK)
      77. Cryogenic payload meetings (2016 November 22nd KEK)
      78. Cryogenic payload meetings (2016 November 15th KEK)
      79. Cryogenic payload meetings (2016 November 1st KEK)
      80. Cryogenic payload meetings (2016 October 19th KEK)
      81. Cryogenic payload meetings (2016 October 4th KEK)
      82. Cryogenic payload meetings (2016 September 27th ICRR)
      83. Cryogenic payload meetings (2016 September 14th ICRR)
      84. Cryogenic payload meetings (2016 September 6th ICRR)
      85. Cryogenic payload meetings (2016 August 30th ICRR)
      86. Cryogenic payload meetings (2016 August 17th ICRR)
      87. Cryogenic payload meetings (2016 August 9th ICRR)
      88. Cryogenic payload meetings (2016 July 26th ICRR)
      89. Cryogenic payload meetings (2016 July 20th ICRR)
      90. Cryogenic payload meetings (2016 July 12th ICRR)
      91. Cryogenic payload meetings (2016 July 5th KEK, ICRR)
      92. Cryogenic payload meetings (2016 June 28th KEK, ICRR)
      93. Cryogenic payload meetings (2016 June 21st KEK, ICRR)
      94. Cryogenic payload meetings (2016 June 13th KEK, ICRR)
      95. Cryogenic payload meetings (2016 June 7th KEK, ICRR)
      96. Cryogenic payload meetings (2016 June 1st KEK, ICRR)
      97. Cryogenic payload meetings (2016 May 17th KEK, ICRR)
      98. Cryogenic payload meetings (2016 May 10th KEK)
      99. Cryogenic payload meetings (2016 April 27th KEK, ICRR)
      100. Cryogenic payload meetings (2016 April 19th KEK, ICRR)
      101. Cryogenic payload meetings (2016 April 13th KEK)
      102. Cryogenic payload meetings (2016 March 29th KEK, ICRR)
      103. Meeting of box for sapphire mirror (2016 March 16th Perugia, ICRR)
      104. Cryogenic payload meetings (2016 March 15th KEK, ICRR)
      105. Cryogenic payload meetings (2016 March 8th KEK, ICRR)
      106. Cryogenic payload meetings (2016 March 1st KEK, ICRR)
      107. Cryogenic integration meetings (2016 February 25th KEK)
      108. Cryogenic integration meetings (2016 February 2nd KEK, ICRR)
      109. Cryogenic integration meetings (2016 January 26th KEK, ICRR)
      110. Cryogenic integration meetings (2016 January 19th KEK, ICRR)
      111. Cryogenic integration meetings (2016 January 13th KEK, ICRR)
      112. Cryogenic integration meetings (2015 December 24th KEK, ICRR)
      113. Cryogenic integration meetings (2015 December 15th KEK, ICRR)
      114. Cryogenic integration meetings (2015 December 10th KEK)
      115. Cryogenic integration meetings (2015 November 10th KEK)
      116. Cryogenic integration meetings (2015 October 28th KEK)
      117. Cryogenic integration meetings (2015 October 20th KAGRA,KEK,ICRR)
      118. Cryogenic integration meetings (2015 October 14th KEK)
      119. Cryogenic integration meetings (2015 September 15th NAOJ)
      120. Cryogenic integration meetings (2015 September 8th ICRR)
      121. Cryogenic integration meetings (2015 August 18th KEK)
      122. Cryogenic integration meetings (2015 August 11th NAOJ)
      123. Cryogenic integration meetings (2015 August 4th KEK)
      124. Cryogenic integration meetings (2015 July 31st ICRR)
      125. Cryogenic integration and payload meetings (2015 July 16th ICRR)
      126. Cryogenic integration and payload meetings (2015 July 8th ICRR)
      127. Cryogenic integration and payload meetings (2015 June 23rd ICRR)
      128. Cryogenic integration and payload meetings (2015 June 16th ICRR)
      129. Cryogenic integration and payload meetings (2015 June 9th ICRR)
      130. Cryogenic integration and payload meetings (2015 June 2nd ICRR)
      131. Cryogenic integration and payload meetings (2015 May 19th ICRR)
      132. Cryogenic integration and payload meetings (2015 April 28th ICRR)
      133. Cryogenic integration and payload meetings (2015 April 21st ICRR)
      134. Cryogenic integration and payload meetings (2015 April 14th ICRR)
      135. Cryogenic integration and payload meetings (2015 April 7th ICRR)
      136. Cryogenic integration and payload meetings (2015 March 17th ICRR)
      137. Cryogenic integration and payload meetings (2015 March 10th ICRR)
      138. Cryogenic integration and payload meetings (2015 March 3rd ICRR)
      139. Cryogenic integration and payload meetings (2015 February 17th ICRR)
      140. Cryogenic integration and payload meetings (2015 January 28th ICRR)
      141. Cryogenic integration and payload meetings (2015 January 20th ICRR)
      142. Cryogenic integration and payload meetings (2015 January 13th ICRR)
      143. Cryogenic integration and payload meetings (2014 December 16th ICRR)
      144. Cryogenic integration and payload meetings (2014 December 9th ICRR)
      145. Cryogenic integration and payload meetings (2014 November 26th ICRR)
      146. Cryogenic integration and payload meetings (2014 November 18th ICRR)
      147. Cryogenic integration and payload meetings (2014 November 11th ICRR)
      148. Cryogenic integration and payload meetings (2014 October 28th ICRR)
      149. Cryogenic integration and payload meetings (2014 October 21st ICRR)
      150. Cryogenic integration and payload meetings (2014 October 7th ICRR)
      151. Cryogenic integration and payload meetings (2014 September 17th ICRR)
      152. Cryogenic integration and payload meetings (2014 September 9th ICRR)
      153. Cryogenic integration and payload meetings (2014 September 2nd ICRR)
      154. Cryogenic integration and payload meetings (2014 August 26th ICRR)
      155. Cryogenic integration and payload meetings (2014 August 5th ICRR)
      156. Cryogenic integration and payload meetings (2014 July 23rd ICRR)
      157. Cryogenic integration and payload meetings (2014 July 15th ICRR)
      158. Cryogenic integration and payload meetings (2014 July 8th ICRR)
      159. Cryogenic integration and payload meetings (2014 June 24th ICRR)
      160. Cryogenic integration and payload meetings (2014 June 17th ICRR)
      161. Cryogenic integration and payload meetings (2014 June 10th ICRR)
      162. Cryogenic integration and payload meetings (2014 June 3rd ICRR)
      163. Cryogenic integration and payload meetings (2014 May 20th ICRR)
      164. Cryogenic integration and payload meetings (2014 May 13th ICRR)
      165. Cryogenic integration and payload meetings (2014 Apr. 30th ICRR)
      166. Cryogenic integration and payload meetings (2014 Apr. 22nd ICRR)
      167. Cryogenic integration and payload meetings (2014 Apr. 15th ICRR)
      168. Cryogenic integration and payload meetings (2014 Apr. 8th ICRR)
      169. Cryogenic integration and payload meetings (2014 Mar. 18th ICRR)
      170. Cryogenic integration and payload meetings (2014 Mar. 11th ICRR)
      171. Cryogenic integration and payload meetings (2014 Mar. 4th ICRR)
      172. Cryogenic integration and payload meetings (2014 Feb. 25th ICRR)
      173. Cryogenic payload meeting (2014 Feb. 18th ICRR)
      174. Cryogenic payload meeting (2014 Feb. 4th ICRR)
      175. Cryogenic payload meeting (2014 Jan. 28th ICRR)
      176. Cryogenic payload meeting (2014 Jan. 21st ICRR)
      177. Cryogenic payload meeting (2014 Jan. 14th ICRR)
      178. Cryogenic payload meeting (2014 Jan. 7th ICRR)
      179. Cryogenic payload meeting (2013 Dec. 24th ICRR)
      180. Cryogenic payload meeting (2013 Dec. 17th ICRR)
      181. Cryogenic payload meeting (2013 Dec. 10th ICRR)
      182. Cryogenic payload meeting (2013 Dec. 3rd ICRR)
      183. Cryogenic payload meeting (2013 Nov. 26th ICRR)
      184. Cryogenic payload meeting (2013 Nov. 19th ICRR)
      185. Cryogenic payload kickoff meeting (2013 Nov. 15th ICRR)
      186. 20th cryogenic payload meeting (2013 Feb. 6 ICRR)
      187. 19th cryogenic payload meeting (2013 Jan. 9 ICRR)
      188. 18th cryogenic payload meeting (2012 Dec. 12 ICRR)
      189. 17th cryogenic payload meeting (2012 Nov. 4 ICRR)
      190. 16th cryogenic payload meeting (2012 Sep. 26 ICRR)
      191. 15th cryogenic payload meeting (2012 Aug. 29 ICRR)
      192. 14th cryogenic payload meeting (2012 Aug. 8 ICRR)
      193. 13th cryogenic payload meeting (2012 July. 4 ICRR)
      194. 12th cryogenic payload meeting (2012 June. 6 ICRR)
      195. 11th cryogenic payload meeting (2012 April. 25 ICRR)
      196. 10th cryogenic payload meeting (2012 April. 4 ICRR)
      197. 9th cryogenic payload meeting (2012 Mar. 7 ICRR)
      198. 8th cryogenic payload meeting (2012 Feb. 8 ICRR)
      199. 第七回 低温懸架打ち合わせ(2012.1.10 ICRR)
      200. 第六回 低温懸架打ち合わせ(2011.11.30 ICRR)
      201. 第五回 低温懸架打ち合わせ(2011.10.26 ICRR)
      202. 第四回 低温懸架打ち合わせ(2011.09.28 ICRR)
      203. 第三回 低温懸架打ち合わせ(2011.08.31 ICRR)
      204. 第一回 低温懸架打ち合わせ(2011.07.01 KEK)
      205. 低温装置打ち合わせ

General Descriptions

Here are slides and minute for Cryogenic integration and payload meetings.

Design drawings

Schedule about cryogenic payload

Action Items list


Cryogenic payload meetings (2018 July 10th KEK)

Cryogenic payload meetings (2018 July 3rd KEK)

Cryogenic payload meetings (2018 June 26th KEK)

Cryogenic payload meetings (2018 June 19th KEK)

Cryogenic payload meetings (2018 June 12th KEK)

Cryogenic payload meetings (2018 June 5th KEK)

Cryogenic payload meetings (2018 May 29th KEK)

Cryogenic payload meetings (2018 May 22nd KEK)

Cryogenic payload meetings (2018 May 15th KEK)

Cryogenic payload meetings (2018 May 10th KEK)

Cryogenic payload meetings (2018 May 2nd KEK)

Cryogenic payload meetings (2018 April 24th KEK)

Cryogenic payload meetings (2018 April 17th KEK)

Cryogenic payload meetings (2018 April 10th KEK)

Cryogenic payload meetings (2018 April 4th KEK)

Cryogenic payload meetings (2018 March 27th KEK)

Cryogenic payload meetings (2018 March 20th KEK)

Cryogenic payload meetings (2018 March 13th KEK)

Cryogenic payload meetings (2018 March 6th KEK)

Cryogenic payload meetings (2018 February 27th KEK)

Cryogenic payload meetings (2018 February 20th KEK)

Cryogenic payload meetings (2018 February 13th KEK)

Cryogenic payload meetings (2018 February 7th KEK)

Cryogenic payload meetings (2018 January 30th KEK)

Cryogenic payload meetings (2018 January 23rd KEK)

Cryogenic payload meetings (2018 January 16th KEK)

Cryogenic payload meetings (2018 January 9th KEK)

Cryogenic payload meetings (2017 December 26th KEK)

Cryogenic payload meetings (2017 December 19th KEK)

Cryogenic payload meetings (2017 December 12th KEK)

Cryogenic payload meetings (2017 December 5th TiTech)

Cryogenic payload meetings (2017 November 28th KEK)

Cryogenic payload meetings (2017 November 21st KEK)

Cryogenic payload meetings (2017 November 14th KEK)

Cryogenic payload meetings (2017 November 7th KEK)

Cryogenic payload meetings (2017 October 31st KEK)

Cryogenic payload meetings (2017 October 25th KEK)

Cryogenic payload meetings (2017 October 17th KEK)

Cryogenic payload meetings (2017 October 10th KEK)

Cryogenic payload meetings (2017 October 3rd KEK)

Cryogenic payload meetings (2017 September 26th KEK)

Cryogenic payload meetings (2017 September 19th KEK)

Cryogenic payload meetings (2017 September 5th KEK)

Cryogenic payload short meetings (2017 August 29th Toyama)

Cryogenic payload meetings (2017 August 22nd KEK)

Cryogenic payload meetings (2017 August 8th KEK)

Cryogenic payload meetings (2017 July 28th KEK)

Cryogenic payload meetings (2017 July 21st KEK)

Cryogenic payload meetings (2017 July 14th KEK)

Cryogenic payload meetings (2017 June 30th KEK)

Cryogenic payload meetings (2017 June 23rd KEK)

Cryogenic payload meetings (2017 June 16th KEK)

Cryogenic payload meetings (2017 June 8th KEK)

Cryogenic payload meetings (2017 June 1st KEK)

Cryogenic payload meetings (2017 May 26th KEK)

Cryogenic payload meetings (2017 May 9th KEK)

Cryogenic payload meetings (2017 April 25th KEK)

Cryogenic payload meetings (2017 April 18th KEK)

Cryogenic payload meetings (2017 April 11th KEK)

Cryogenic payload meetings (2017 April 4th KEK)

Cryogenic payload meetings (2017 March 21st KEK)

Cryogenic payload meetings (2017 March 14th KEK)

Cryogenic payload meetings (2017 March 7th KEK)

Cryogenic payload meetings (2017 February 28th KEK)

Cryogenic payload meetings (2017 February 21st KEK)

Cryogenic payload meetings (2017 February 14th KEK)

Cryogenic payload meetings (2017 February 7th KEK)

Cryogenic payload meetings (2017 January 31st ICRR)

Cryogenic payload meetings (2017 January 24th KEK)

Cryogenic payload meetings (2017 January 17th KEK)

Cryogenic payload meetings (2017 January 11th KEK)

Cryogenic payload meetings (2016 December 21st KEK)

Cryogenic payload meetings (2016 November 29nd KEK)

Cryogenic payload meetings (2016 November 22nd KEK)

Cryogenic payload meetings (2016 November 15th KEK)

Cryogenic payload meetings (2016 November 1st KEK)

Cryogenic payload meetings (2016 October 19th KEK)

Cryogenic payload meetings (2016 October 4th KEK)

Cryogenic payload meetings (2016 September 27th ICRR)

Cryogenic payload meetings (2016 September 14th ICRR)

Cryogenic payload meetings (2016 September 6th ICRR)

Cryogenic payload meetings (2016 August 30th ICRR)

Cryogenic payload meetings (2016 August 17th ICRR)

Cryogenic payload meetings (2016 August 9th ICRR)

Cryogenic payload meetings (2016 July 26th ICRR)

Cryogenic payload meetings (2016 July 20th ICRR)

Cryogenic payload meetings (2016 July 12th ICRR)

Cryogenic payload meetings (2016 July 5th KEK, ICRR)

Cryogenic payload meetings (2016 June 28th KEK, ICRR)

Cryogenic payload meetings (2016 June 21st KEK, ICRR)

Cryogenic payload meetings (2016 June 13th KEK, ICRR)

Cryogenic payload meetings (2016 June 7th KEK, ICRR)

Cryogenic payload meetings (2016 June 1st KEK, ICRR)

Cryogenic payload meetings (2016 May 17th KEK, ICRR)

Cryogenic payload meetings (2016 May 10th KEK)

Cryogenic payload meetings (2016 April 27th KEK, ICRR)

Cryogenic payload meetings (2016 April 19th KEK, ICRR)

Cryogenic payload meetings (2016 April 13th KEK)

Cryogenic payload meetings (2016 March 29th KEK, ICRR)

Meeting of box for sapphire mirror (2016 March 16th Perugia, ICRR)

Cryogenic payload meetings (2016 March 15th KEK, ICRR)

Cryogenic payload meetings (2016 March 8th KEK, ICRR)

Cryogenic payload meetings (2016 March 1st KEK, ICRR)

Cryogenic integration meetings (2016 February 25th KEK)

Cryogenic integration meetings (2016 February 2nd KEK, ICRR)

Cryogenic integration meetings (2016 January 26th KEK, ICRR)

Cryogenic integration meetings (2016 January 19th KEK, ICRR)

Cryogenic integration meetings (2016 January 13th KEK, ICRR)

Cryogenic integration meetings (2015 December 24th KEK, ICRR)

Cryogenic integration meetings (2015 December 15th KEK, ICRR)

Cryogenic integration meetings (2015 December 10th KEK)

Cryogenic integration meetings (2015 November 10th KEK)

Cryogenic integration meetings (2015 October 28th KEK)

Cryogenic integration meetings (2015 October 20th KAGRA,KEK,ICRR)

Cryogenic integration meetings (2015 October 14th KEK)

Cryogenic integration meetings (2015 September 15th NAOJ)

Cryogenic integration meetings (2015 September 8th ICRR)

Cryogenic integration meetings (2015 August 18th KEK)

Cryogenic integration meetings (2015 August 11th NAOJ)

Cryogenic integration meetings (2015 August 4th KEK)

Cryogenic integration meetings (2015 July 31st ICRR)

Cryogenic integration and payload meetings (2015 July 16th ICRR)

Cryogenic integration and payload meetings (2015 July 8th ICRR)

Cryogenic integration and payload meetings (2015 June 23rd ICRR)

Cryogenic integration and payload meetings (2015 June 16th ICRR)

Cryogenic integration and payload meetings (2015 June 9th ICRR)

Cryogenic integration and payload meetings (2015 June 2nd ICRR)

Cryogenic integration and payload meetings (2015 May 19th ICRR)

Cryogenic integration and payload meetings (2015 April 28th ICRR)

Cryogenic integration and payload meetings (2015 April 21st ICRR)

Cryogenic integration and payload meetings (2015 April 14th ICRR)

Cryogenic integration and payload meetings (2015 April 7th ICRR)

Cryogenic integration and payload meetings (2015 March 17th ICRR)

Cryogenic integration and payload meetings (2015 March 10th ICRR)

Cryogenic integration and payload meetings (2015 March 3rd ICRR)

Cryogenic integration and payload meetings (2015 February 17th ICRR)

Cryogenic integration and payload meetings (2015 January 28th ICRR)

Cryogenic integration and payload meetings (2015 January 20th ICRR)

  • Cryo-Payload Mechanics
    • Design (PF, IM, IMR): To design Platform, intermediate recoil mass, sensor & actuators designs, we need experimental test.

      • preset test: local sensor -> Miyamoto-kun, Cu-Be -> Tomaru.

      • Our GM cryostat is busy now. After finishing Miyamoto-kun's sensor test, spring constant test of CuBe will be done.

    • Heat link: I had discussion for 6N-Al stranded cable fabrication with Mitsubishi Densen Co. They can make stranded cable but can not make thin wire. Noge Denki Co. can make thin wire. I will have meeting with Mitsubishi Densen for teat fabrication on around Feb. 3.
    • Moving Mass:
      • We will use Tungsten alloy mass for moving mass. This tungsten alloy has 18g/cm^3 in density and good for machining. We have already purchased four masses.
    • Recoil mass: under fabrication in KEK machine shop.
    • Vertical Spring (Tomaru): It was difficult to measure mass motion by Takahashi-san's displacement sensor in our 1/4 cryostat. I introduced PSD sensor to measure it. It looks fine.
  • 変位センサの低温テストについての現状報告(ヘリウム温度)(T. Miyamoto)

  • Minutes(K. Yamamoto)

Cryogenic integration and payload meetings (2015 January 13th ICRR)

Cryogenic integration and payload meetings (2014 December 16th ICRR)

Cryogenic integration and payload meetings (2014 December 9th ICRR)

Cryogenic integration and payload meetings (2014 November 26th ICRR)

Cryogenic integration and payload meetings (2014 November 18th ICRR)

Cryogenic integration and payload meetings (2014 November 11th ICRR)

Cryogenic integration and payload meetings (2014 October 28th ICRR)

Cryogenic integration and payload meetings (2014 October 21st ICRR)

Cryogenic integration and payload meetings (2014 October 7th ICRR)

Cryogenic integration and payload meetings (2014 September 17th ICRR)

Cryogenic integration and payload meetings (2014 September 9th ICRR)

Cryogenic integration and payload meetings (2014 September 2nd ICRR)

Cryogenic integration and payload meetings (2014 August 26th ICRR)

Cryogenic integration and payload meetings (2014 August 5th ICRR)

Cryogenic integration and payload meetings (2014 July 23rd ICRR)

Cryogenic integration and payload meetings (2014 July 15th ICRR)

Cryogenic integration and payload meetings (2014 July 8th ICRR)

Cryogenic integration and payload meetings (2014 June 24th ICRR)

Cryogenic integration and payload meetings (2014 June 17th ICRR)

Cryogenic integration and payload meetings (2014 June 10th ICRR)

Cryogenic integration and payload meetings (2014 June 3rd ICRR)

Cryogenic integration and payload meetings (2014 May 20th ICRR)

Cryogenic integration and payload meetings (2014 May 13th ICRR)

Cryogenic integration and payload meetings (2014 Apr. 30th ICRR)

Cryogenic integration and payload meetings (2014 Apr. 22nd ICRR)

Cryogenic integration and payload meetings (2014 Apr. 15th ICRR)

Cryogenic integration and payload meetings (2014 Apr. 8th ICRR)

Cryogenic integration and payload meetings (2014 Mar. 18th ICRR)

Cryogenic integration and payload meetings (2014 Mar. 11th ICRR)

Cryogenic integration and payload meetings (2014 Mar. 4th ICRR)

Cryogenic integration and payload meetings (2014 Feb. 25th ICRR)

Cryogenic payload meeting (2014 Feb. 18th ICRR)

Cryogenic payload meeting (2014 Feb. 4th ICRR)

Cryogenic payload meeting (2014 Jan. 28th ICRR)

Cryogenic payload meeting (2014 Jan. 21st ICRR)

Cryogenic payload meeting (2014 Jan. 14th ICRR)

Cryogenic payload meeting (2014 Jan. 7th ICRR)

Cryogenic payload meeting (2013 Dec. 24th ICRR)

Cryogenic payload meeting (2013 Dec. 17th ICRR)

Cryogenic payload meeting (2013 Dec. 10th ICRR)

Cryogenic payload meeting (2013 Dec. 3rd ICRR)

Cryogenic payload meeting (2013 Nov. 26th ICRR)

Cryogenic payload meeting (2013 Nov. 19th ICRR)

Cryogenic payload kickoff meeting (2013 Nov. 15th ICRR)

20th cryogenic payload meeting (2013 Feb. 6 ICRR)

19th cryogenic payload meeting (2013 Jan. 9 ICRR)

18th cryogenic payload meeting (2012 Dec. 12 ICRR)

17th cryogenic payload meeting (2012 Nov. 4 ICRR)

16th cryogenic payload meeting (2012 Sep. 26 ICRR)

15th cryogenic payload meeting (2012 Aug. 29 ICRR)

14th cryogenic payload meeting (2012 Aug. 8 ICRR)

13th cryogenic payload meeting (2012 July. 4 ICRR)

12th cryogenic payload meeting (2012 June. 6 ICRR)

11th cryogenic payload meeting (2012 April. 25 ICRR)

10th cryogenic payload meeting (2012 April. 4 ICRR)

9th cryogenic payload meeting (2012 Mar. 7 ICRR)

8th cryogenic payload meeting (2012 Feb. 8 ICRR)

第七回 低温懸架打ち合わせ(2012.1.10 ICRR)

第六回 低温懸架打ち合わせ(2011.11.30 ICRR)

第五回 低温懸架打ち合わせ(2011.10.26 ICRR)

第四回 低温懸架打ち合わせ(2011.09.28 ICRR)

第三回 低温懸架打ち合わせ(2011.08.31 ICRR)

第一回 低温懸架打ち合わせ(2011.07.01 KEK)

低温装置打ち合わせ

.Report of annealing for thin Al bundles 2011.06.24 .・ Heat Linkサンプルの焼鈍結果 110627

.Cryostat Shield (4th) 2011.2.24 and Cryostat Shield (4th) 2011.2.25, KEK Cryogenics Centre R110

.Cryostat Shield (4th) 2011.2.14 KEK Cryogenics Centre R110

.Cryostat Shield (3rd) 2011.2.10 KEK Cryogenics Centre R110 Polycom+EVO

.Cryostat 2010.11.18 EVO

back to CRY top

KAGRA/Subgroups/CRY/CRYpmeeting (last edited 2020-04-22 21:17:34 by KazuhiroYamamoto)