Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2014-03-17 18:16:01
Size: 172
Editor: tomaru
Comment:
Revision 3 as of 2014-03-17 18:30:16
Size: 541
Editor: tomaru
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
* Management (Suzuki, Tomaru)
* Schedule (Suzuki)
* Mirror Cryostat (Kimura, Suzuki, Tomaru)
*
* Management & Schedule (Suzuki)

* Installation (Tomaru, Suzuki)

* Mirror Cryostat (Sakakibara, Kimura)

* Duct Shield (Sakakibara, Kimura)

* Cryocoolers (Tomaru, Suzuki)

* Type A SAS @300K (Sekiguchi, Takahashi)

* Cryo-Payload

   * Design (Hirose, Sekibuchi)

   * Cryo-Payload Fabrication (Tomaru)

* Baffle and Auxiliary Optics Subsystem (Akutsu)

* Sapphire Mirror (Hirose)

* Sapphire Mirror Suspension (Chen, Sascha, Rahul, Yamamoto)

Cryogenic System Integration Meeting 2013 FY

2014.03.18

* Management & Schedule (Suzuki)

* Installation (Tomaru, Suzuki)

* Mirror Cryostat (Sakakibara, Kimura)

* Duct Shield (Sakakibara, Kimura)

* Cryocoolers (Tomaru, Suzuki)

* Type A SAS @300K (Sekiguchi, Takahashi)

* Cryo-Payload

  • Design (Hirose, Sekibuchi)
  • Cryo-Payload Fabrication (Tomaru)

* Baffle and Auxiliary Optics Subsystem (Akutsu)

* Sapphire Mirror (Hirose)

* Sapphire Mirror Suspension (Chen, Sascha, Rahul, Yamamoto)

KAGRA/Subgroups/CRY/CSIM/CSIM2013FY (last edited 2014-03-20 14:34:33 by KazuhiroYamamoto)