172
Comment:
|
541
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
* Management (Suzuki, Tomaru) * Schedule (Suzuki) * Mirror Cryostat (Kimura, Suzuki, Tomaru) * |
* Management & Schedule (Suzuki) * Installation (Tomaru, Suzuki) * Mirror Cryostat (Sakakibara, Kimura) * Duct Shield (Sakakibara, Kimura) * Cryocoolers (Tomaru, Suzuki) * Type A SAS @300K (Sekiguchi, Takahashi) * Cryo-Payload * Design (Hirose, Sekibuchi) * Cryo-Payload Fabrication (Tomaru) * Baffle and Auxiliary Optics Subsystem (Akutsu) * Sapphire Mirror (Hirose) * Sapphire Mirror Suspension (Chen, Sascha, Rahul, Yamamoto) |
Cryogenic System Integration Meeting 2013 FY
2014.03.18
* Management & Schedule (Suzuki)
* Installation (Tomaru, Suzuki)
* Mirror Cryostat (Sakakibara, Kimura)
* Duct Shield (Sakakibara, Kimura)
* Cryocoolers (Tomaru, Suzuki)
* Type A SAS @300K (Sekiguchi, Takahashi)
* Cryo-Payload
- Design (Hirose, Sekibuchi)
- Cryo-Payload Fabrication (Tomaru)
* Baffle and Auxiliary Optics Subsystem (Akutsu)
* Sapphire Mirror (Hirose)
* Sapphire Mirror Suspension (Chen, Sascha, Rahul, Yamamoto)