Line 4: Line 4:
* Management (Suzuki, Tomaru)
* Schedule (Suzuki)
* Mirror Cryostat (Kimura, Suzuki, Tomaru)
*
 * Management & Schedule (Suzuki)

 * Installation (Tomaru, Suzuki)
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2259|Cryo duct on ceiling of radiation shield(T. Tomaru)]]

 * Mirror Cryostat (Sakakibara, Kimura)

 * Duct Shield (Sakakibara, Kimura)

 * Cryocoolers (Tomaru, Suzuki)

 * Type A SAS @300K (Sekiguchi, Takahashi)

 * Cryo-Payload

   * Design (Hirose, Sekiguchi, Rahul)

   * Cryo-Payload Fabrication (Tomaru)

 * Baffle and Auxiliary Optics Subsystem (Akutsu)

 * Sapphire Mirror (Hirose)

 * Sapphire Mirror Suspension (Chen, Sascha, Yamamoto)

Cryogenic System Integration Meeting 2013 FY

2014.03.18

  • Management & Schedule (Suzuki)

  • Installation (Tomaru, Suzuki)
  • Cryo duct on ceiling of radiation shield(T. Tomaru)

  • Mirror Cryostat (Sakakibara, Kimura)
  • Duct Shield (Sakakibara, Kimura)
  • Cryocoolers (Tomaru, Suzuki)
  • Type A SAS @300K (Sekiguchi, Takahashi)
  • Cryo-Payload
    • Design (Hirose, Sekiguchi, Rahul)
    • Cryo-Payload Fabrication (Tomaru)
  • Baffle and Auxiliary Optics Subsystem (Akutsu)
  • Sapphire Mirror (Hirose)
  • Sapphire Mirror Suspension (Chen, Sascha, Yamamoto)