Differences between revisions 2 and 4 (spanning 2 versions)
Revision 2 as of 2014-03-17 18:16:16
Size: 178
Editor: tomaru
Comment:
Revision 4 as of 2014-03-17 18:30:44
Size: 551
Editor: tomaru
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
* Management (Suzuki, Tomaru)  * Management & Schedule (Suzuki)
Line 6: Line 6:
* Schedule (Suzuki)  * Installation (Tomaru, Suzuki)
Line 8: Line 8:
* Mirror Cryostat (Kimura, Suzuki, Tomaru)  * Mirror Cryostat (Sakakibara, Kimura)
Line 10: Line 10:
*  * Duct Shield (Sakakibara, Kimura)

 * Cryocoolers (Tomaru, Suzuki)

 * Type A SAS @300K (Sekiguchi, Takahashi)

 * Cryo-Payload

   * Design (Hirose, Sekibuchi)

   * Cryo-Payload Fabrication (Tomaru)

 * Baffle and Auxiliary Optics Subsystem (Akutsu)

 * Sapphire Mirror (Hirose)

 * Sapphire Mirror Suspension (Chen, Sascha, Rahul, Yamamoto)

Cryogenic System Integration Meeting 2013 FY

2014.03.18

  • Management & Schedule (Suzuki)

  • Installation (Tomaru, Suzuki)
  • Mirror Cryostat (Sakakibara, Kimura)
  • Duct Shield (Sakakibara, Kimura)
  • Cryocoolers (Tomaru, Suzuki)
  • Type A SAS @300K (Sekiguchi, Takahashi)
  • Cryo-Payload
    • Design (Hirose, Sekibuchi)
    • Cryo-Payload Fabrication (Tomaru)
  • Baffle and Auxiliary Optics Subsystem (Akutsu)
  • Sapphire Mirror (Hirose)
  • Sapphire Mirror Suspension (Chen, Sascha, Rahul, Yamamoto)

KAGRA/Subgroups/CRY/CSIM/CSIM2013FY (last edited 2014-03-20 14:34:33 by KazuhiroYamamoto)