178
Comment:
|
551
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
* Management (Suzuki, Tomaru) | * Management & Schedule (Suzuki) |
Line 6: | Line 6: |
* Schedule (Suzuki) | * Installation (Tomaru, Suzuki) |
Line 8: | Line 8: |
* Mirror Cryostat (Kimura, Suzuki, Tomaru) | * Mirror Cryostat (Sakakibara, Kimura) |
Line 10: | Line 10: |
* | * Duct Shield (Sakakibara, Kimura) * Cryocoolers (Tomaru, Suzuki) * Type A SAS @300K (Sekiguchi, Takahashi) * Cryo-Payload * Design (Hirose, Sekibuchi) * Cryo-Payload Fabrication (Tomaru) * Baffle and Auxiliary Optics Subsystem (Akutsu) * Sapphire Mirror (Hirose) * Sapphire Mirror Suspension (Chen, Sascha, Rahul, Yamamoto) |
Cryogenic System Integration Meeting 2013 FY
2014.03.18
Management & Schedule (Suzuki)
- Installation (Tomaru, Suzuki)
- Mirror Cryostat (Sakakibara, Kimura)
- Duct Shield (Sakakibara, Kimura)
- Cryocoolers (Tomaru, Suzuki)
- Type A SAS @300K (Sekiguchi, Takahashi)
- Cryo-Payload
- Design (Hirose, Sekibuchi)
- Cryo-Payload Fabrication (Tomaru)
- Baffle and Auxiliary Optics Subsystem (Akutsu)
- Sapphire Mirror (Hirose)
- Sapphire Mirror Suspension (Chen, Sascha, Rahul, Yamamoto)