Differences between revisions 6 and 7
Revision 6 as of 2014-03-18 12:02:43
Size: 693
Comment:
Revision 7 as of 2014-03-18 12:04:17
Size: 693
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1918|Cryo duct on ceiling of radiation shield(T. Tomaru)]]  . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2259|Cryo duct on ceiling of radiation shield(T. Tomaru)]]

Cryogenic System Integration Meeting 2013 FY

2014.03.18

  • Management & Schedule (Suzuki)

  • Installation (Tomaru, Suzuki)
  • Cryo duct on ceiling of radiation shield(T. Tomaru)

  • Mirror Cryostat (Sakakibara, Kimura)
  • Duct Shield (Sakakibara, Kimura)
  • Cryocoolers (Tomaru, Suzuki)
  • Type A SAS @300K (Sekiguchi, Takahashi)
  • Cryo-Payload
    • Design (Hirose, Sekiguchi, Rahul)
    • Cryo-Payload Fabrication (Tomaru)
  • Baffle and Auxiliary Optics Subsystem (Akutsu)
  • Sapphire Mirror (Hirose)
  • Sapphire Mirror Suspension (Chen, Sascha, Yamamoto)

KAGRA/Subgroups/CRY/CSIM/CSIM2013FY (last edited 2014-03-20 14:34:33 by KazuhiroYamamoto)