Differences between revisions 9 and 10
Revision 9 as of 2014-03-18 13:50:42
Size: 750
Comment:
Revision 10 as of 2014-03-18 13:51:25
Size: 781
Comment:
Deletions are marked like this. Additions are marked like this.
Line 19: Line 19:
   * Heat link (Sakakibara)

Cryogenic System Integration Meeting 2013 FY

2014.03.18

  • Management & Schedule (Suzuki)

  • Installation (Tomaru, Suzuki)
  • Cryo duct on ceiling of radiation shield(T. Tomaru)

  • Mirror Cryostat (Sakakibara, Kimura)
  • Duct Shield (Sakakibara, Kimura)
  • Cryocoolers (Tomaru, Suzuki)
  • Room temperature SAS (Sekiguchi, Takahashi)
  • Cryo-Payload
    • Heat link (Sakakibara)
    • Design (PF, IM, IMR) (Hirose, Sekiguchi, Rahul)
    • Fabrication (PF, IM, IMR) (Tomaru)
    • Recoil mass
    • Sapphire Mirror (Hirose)
    • Sapphire Mirror Suspension (Chen, Sascha, Yamamoto)
    • Test
  • Baffle and Auxiliary Optics Subsystem (Akutsu)

KAGRA/Subgroups/CRY/CSIM/CSIM2013FY (last edited 2014-03-20 14:34:33 by KazuhiroYamamoto)